Loading…
Loading…
61,980 results • Best match
Improvement of water supply to valpoi muncipal area Replacement of old AC pipeline in Velus area in Valpoi Muncipal Council Including O M of 5 years under AMRUT 2.0
REPLACEMENT OF OLD C.I. PIPELINE BY D.I. NEAR 36,39 NASKAR PARA ROAD AND EXTENSION OF WATER SUPPLY NETWORK BY LAYING 100 MM. DIA. D.I. PIPELINE OPPOSITE CALCUTTA GLASS AND PICTURE HOUSE,NASKAR PARA ROAD IN WARD NO 115, BR XIII.
Restoration of rain damages by providing laying and jointing of API pipe 80 mm dia and providing and fixing of NRV of 80 mm dia class ASA 300
Providing Laying, Jointed with Butt welding & testing of API pipes 80 mm dia as per IS: 3183-2007 in a length of 100 mtrs. Including Zinc coating treatment complete with flange table 28 hickness of pipe 4.80 mm
Restoration of rain damages by providing laying and jointing of API pipe 80 mm dia and providing and fixing of NRV of 80 mm dia class ASA 300
Providing Laying, Jointed with Butt welding & testing of API pipes 80 mm dia as per IS: 3183-2007 in a length of 100 mtrs. Including Zinc coating treatment complete with flange table 28 hickness of pipe 4.80 mm
DEVELOPMENT OF UNDERGROUND DRAINAGE SYSTEM BY LAYING OF S.W. PIPE AND DEVELOPMENT OF CEMENT CONCRETE PASSAGE NEAR HOUSE NO- 102 B.B. SENGUPTA ROAD ETC, IN WARD NO 128.
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm
Supply and laying of Electric Cables and DWC Pipe in Reconstruction and Restoration of Shri Kedarnath Town and Surrounding Areas under CSR for Overall Infrastructure Development Electrical Work.
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc. , complete as required.