Loading…
Loading…
62,669 results • Best match
Drilling of Tube well, Installation of submersible pump and laying of pipe line at various 33/11 kv S/s (Ajleshwar, Rusalla, Mathner, Manheti, Kukawli) Under O and M Circle Ashok Nagar
Drilling of Tube well, Installation of submersible pump and laying of pipe line at various 33/11 kv S/s (Ajleshwar, Rusalla, Mathner, Manheti, Kukawli) Under O&M Circle Ashok Nagar
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Niladri of Ranjit G.P. under Bhandaripokhari Block
... the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem. The contractor shall repair and replace ...
State Plan-State Plan 2025-26- Rural Water Supply Schemes - Replacement of Unserviceable Pipe - RWSS to Chunakkara- Replacement of 100mm AC pipe with 110mm PVC pipe from Kidangil to Karingattil Gurumandiram-Pipeline Work
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
REPAIR MAINT AND REDEVELOPMENT OF EXISTING BOREWELL ALONGWITH CONNECTED OLD RUSTED PIPELINE INCL REPAIR/REPLACEMENT OF DEFECTIVE STARTER PANEL INCL DAY TO DAY MAINT OF EXTERNAL WATER SUPPLY AT NAVAL STATION KARANJA
Carrying out Jungle cutting & Ghas cutting in water supply installation and over head water reservoir,Chunabhatti pump house to NAD pump house alongwith pipe line both side and shifting of debris to a distance of 50 mtr away from site complete all as specified and directed.
Construction of new 33 kV UG line double by micro tunneling 1220 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C400 sq mm XLPE cable from Bombay Road Subway to Bhuiapara Khatal under Howrah 1 Division
Micro Tunnel with 200mm Dai PE 80Pn 6 HDPE Pipe, according to instruction of site engineering.
Construction of new 33 kV UG line by micro tunneling 590 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Bhuiapara Khatal to Rajchandrapur Zero Point under Howrah 1 Division
Micro Tunnel with 200mm Dai PE 80Pn 6 HDPE Pipe, according to instruction of site engineering.