Loading…
Loading…
63,000 results • Best match
SUPPLYING AND LAYING OF 100MM DIA DI PIPE FOR THE DEVELOPMENT OF WATER SUPPLY NETWORK SYSTEM NEAR PREMISES NO 25C JORABAGAN, 2/51 JORABAGAN ETC IN WARD 99 BR X
CONSTRUCTION OF WATER TANK AND PROVIDING WATER PIPELINE AND REPAIR AT PHC PIMPALGAON/SADAK TH-LAKHANI
eProcurement System Government of Maharashtra Created By: Vinodkumar Churhe Created Date/Time: 24-Mar-2025 07:20 PM Tender Title: CONSTRUCTION OF WATER TANK AND PROVIDING WATER PIPELINE AND REPAIR AT PHC PIMPALGAON/SADAK TH-LAKHANI Tender ID: 2025_BHAND_1148468_2
Providing and laying of HDPE pipe line, dripline and sprinkler system on Green Strips on the both sides of C-Hexagon Road.
Providing and laying HDPE Pipe confirming to IS:4984(as amended) suitable for respective working pressure with all the... coupling, tees, bends reducers,screwed adaptors ,flanged, etc. jointing with any dia. pipe including trenching, refilling & testing of joints complete as per direction of Engineer-in- Charge. 160 mm pipe PN 10 PE100 of make Duraline/Supreme/Dinesh/Astral/Jain or equivalent.
Operation of water supply pump including distribution of water at Kumardhubi Colliery (2019-20).
Engagement of Man power including operation of water supply i.e. Engagement of unskilled labour and Engagement of semiskilled labour
SUPPLY OF DRINKING WATER FILTER WITH HOT, COLD AND NORMAL WATER DISPENSER MACHINE
eProcurement System of Government of West Bengal Created By: Manabendra Das Created Date/Time: 29-May-2026 05:25 PM Tender Title: SUPPLY OF DRINKING WATER FILTER WITH HOT, COLD AND NORMAL WATER DISPENSER MACHINE Tender ID: 2026_ZPHD_1019749_1
Providing and laying of 300mm SW Pipe of sewer line from housing board area to MPS in Sector-13 Bhiwani
Diversion of approximate Sewer discharge in downstream sewer manhole including Non clog submersible pump, Electric Panel, electric cable, suction pipe, delivery pipe from one manhole to next manhole, pump operator, sewer helper, Chowkidar, Electrician, suitable DG Set, loading unloading transportation, stacking of HDPE / SW pipeline and laying of new pipe complete in all respect