Loading…
Loading…
63,340 results • Best match
Existing sump to new sump laying of 450mm DI pipe linking at Maruthamalai Road kalveerampalayam sump in ward no 37 of west zone
Earth work Excavation in all soils for Water Supply Laying work Including Refilling the Excavated Earth etc complete .,
Balance Work Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE POUNI of BLOCK Multai Distt. BETUL
eProcurement System Government of Madhya Pradesh Created By: Manoj Baghel Created Date/Time: 04-Dec-2025 06:37 PM Tender Title: Balance Work Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE POUNI of BLOCK Multai Distt. BETUL Tender ID: 2025_PHED_463600_1
Laying of 110mm HDPE Pipe line From Near Cold Store To Near Market and Hospital In Moh-Budhupara , Kiratpur
Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com- plate ...
LAYING AND INSTALLATION OF PIPE LINE FROM MANASA MANDIR TO H/O BASUDEB GAYEN. MOUJA - DAYAPUR JL NO- 046
eProcurement System of Government of West Bengal Created By: GOUTAM SARDAR Created Date/Time: 31-Dec-2025 11:41 AM Tender Title: LAYING AND INSTALLATION OF PIPE LINE FROM MANASA MANDIR TO H/O BASUDEB GAYEN. MOUJA - DAYAPUR JL NO- 046 Tender ID: 2025_ZPHD_957028_63
Providing and Laying Reinforced cement concrete pipe from Betala house to main road in ward in ward number 11
Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery. (i) 300 mm internal diameter
(SH- Repair/laying jointing and testing of G.I pipe line at various RDs for village Taliyar, Sarchi Panu etc.)
... work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling / wedging out of soft/hard rock , where blasting... levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly , returning ...