Loading…
Loading…
64,048 results • Best match
Repair of flood pipeline for dewatering of flood water of village Khraintee outfalling RD 29800/L of Extension Gatauli Karela Drain
Repair of flood pipeline for dewatering of flood water of village Khraintee outfalling RD 29800/L of Extension Gatauli Karela Drain
Hiring of Vehicle TATA-407 or Equivalent Vehicle for Pipeline Patrolling and Maintenance of Rising Mains emanating from Okhla Water Works.
Hiring charges of TATA 407 or equivalent for transportation of man/material for day to day maintenance of rising mains emanating from Okhla Water Works including cost of services of operating staff, Cost of lubricating oil, diesel/Petrol/CNG, other consumables for running the vehicle and machinery. Period:- 140 Days (01day*3shift=140 days)
Labour Engaged for Water supply other than Drinking water maintenance work in 109 nos of Mini power pump and 13 nos of Municipal openwells etc at Palladam Municipality (Out Source for water supply)
Labour Engaged for Water supply Drinking water maintenance work in 12 nos of OHTs, 40 nos sulice valves and 405 nos of gate valves etc using Man power for Valve Man (As per Collectorate rate of rates 2025-26) and as directed by the departmental officers etc., complete
Construction of cement concrete standpost with Submersible Pump PVC Water Tank Pipeline Tap near Indira Purbo Para Mosque at Sarmastapur XXII village under Indrani Gram Panchayat
Construction of cement concrete standpost with Submersible Pump PVC Water Tank Pipeline Tap near Indira Purbo Para Mosque at Sarmastapur XXII village under Indrani Gram Panchayat
DRINKING WATER SUPPLY WITH SUBMERSIBLE NEAR KANTAPUKURIA CHOWRASTA AT KANTAPUKURIA
Drinking Water supply with submersible
Day to Day Maintenance Improvement Repair Laying and Fitting of pipes for extension Restoration of water supplies of minor urgent nature of works and execution of small petty works under maintenance and repair falling under the jurisdiction of PHE Su
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and left upto 1.5mt.(Excluding rolling and watering).