Loading…
Loading…
3,485 results • Best match
S.R. to R/C Building No. Islamiya Manzil A-Wing in E-2 Divn., Mumbai.- Providing Water Proofing Treatment to OH Water Tank and UG Tank and Internal Plaster and Repairs to Drainage Arrangement
S.R. to R/C Building No. Islamiya Manzil A-Wing in E-2 Divn., Mumbai.- Providing Water Proofing Treatment to OH Water Tank and UG Tank and Internal Plaster and Repairs to Drainage Arrangement
REPAIR TO WATER PROOFING TREATMENT OF ROOF, PARAPET CHAJJA, FACIA AND OTHER CONNECTED REPAIRING WORKS IN TECH AREA AT AF STN JAMNAGAR
Material and labour for water proofing treatment by applying one coat of oil base bituminous primer @ 0.3 Kg / Sqm with brush / roller, laying of 3 mm thick APP based polymer modified membrane (mineral finish) reinforced non-woven polyester, weight not less than 3.50 Kg / Sqm and sealing all the over laps 150 mm in length side and 100 mm in width side of membranes laid with torch application complete all as specified and as directed.
SH Operation, Repair and Maintenance of raw water intake and percolation wells, all units of water treatment plants i/c the pump houses, pumping machinery installed at percolation wells, raw water stage and main stage, rising main from percolation we
Operation, Repair & Maintenance of raw water intake & percolation wells, all units of water treatment plants i/c the pump houses, pumping machinery installed at percolation wells, raw water stage & main stage, rising main from percolation wells & raw water stage upto the water treatment plants and from the treatment plant to storage tank at Dharon-ki-Dhar, Gravity mains from Dharon-ki-Dhar to MC water storage tanks at Solan, i/c disinfection of the treated water, complete in all respects for 3 years). The detail of labour required is attached as per Annexure "A".
Construction of 60 MT Weigh bridge , Milk Reception dock , Transformer yard and Water treatment at 60 MTPD Powder Plant , Padalur Dairy
Earth work narrow excavation for foundation in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary, refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications.
Canal Water Based Water Supply Project for Construction of 5.00 MLD Water Treatment Plant WTP and other related works including 5 years O and M Part 2 at Samrala Town District Ludhiana Punjab under AMRUT 2 Scheme
Canal Water based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years (Part-2) and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years under AMRUT 2.0 Scheme Town name Rampura Phul
Water Proofing Treatment on roof of Govt. Resi. Qtrs. in Sect. No. 22 under Jail-3 Sub Dn, PWD Bhopal 2nd Call
Water Proofing Treatment on roof of Govt. Resi. Qtrs. in Sect. No. 22 under Jail-3 Sub Dn, PWD Bhopal