Loading…
Loading…
3,574 results • Best match
REPAIR/MAINT TO VARIOUS STP AND CONNECTED WORKS AT AAU, CALEB VIHAR, TAGORE LINE AND KALINGA LINE UNDER AGE E/M AT GE JHANSI
Trimming of tree branches around Bar screen chamber , MBBR reactor, Tube settler, Filteration system, chlorine contact tank/ hypo Dosing tank sludge drying bed , Oil and grease trap chamber, Rawwater collecition sump and over the boundry wall of STP plants area and cleaning upto 3 Mtrs distance from Eqpts and plants removing cut materials (tree branches) from site and stacing properly where directed. Grith of branch (where cutting took place) not exceeding 50 mm complete all as specified.
Provision of Online Continuous Effluent Monitoring System OCEMS for 160 KLD and 112 KLD STP at MLCP East and West Block at Chennai Airport
Supply, Installation, Testing & Commissioning of Online Continuous Effluent Monitoring System (OCEMS) which includes OCEMS Analyser, Data logger, Sensors & Adaptor Cable, Hardware & Software for Data Connectivity with CPCB and TNPCB Care Air Centre, UPS of 1KVA capacity, Alarm Hooters, Power Cabling, mounting arrangement for sensors, pipeline modifications in the existing pipelines for installation of sensors etc complete as required to complete the work at outlet of STP with data transfer to CPCB and TNPCB server for 160 KLD (MLCP-West) & 112 KLD (MLCP-EAST) STP for following parameters BOD, COD, TSS, pH, Temperature and any other additional parameters complying with TNPCB/CPCB norms. As per attached Technical specifications as required. Note:Agency has to provide mobile SIM based connectivity with CPCB and TNPCB for a period of 01 Year.
Survey, Investigation and preparation of detail project report for sewerage I and D and STP 1.00 MLD work under SBM for nagar Panchayat Paonta).
Preparation of Detailed Project Report (DPR) for sewerage interception and diversion works under Swatch Bharat Mission for Nagar Panchayat Paonta Sahib, District Sirmour, Himachal Pradesh, with using advanced technology, Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. The detailed project report should contain complete proposal with detailed design of Sewerage System along with all components and latest authentic references. DPR should contain the drawing, details of measurements and abstract of cost of all STP and sewerage network components, including Inlet Chamber, Screen Chamber, Grit Channel, Distribution Box, secondary treatment reactor, Sludge dewatering and drying systems in the shape of planted and unplanted SDBs, Constructed Wetland (Root zone System) or other suitable technologh, Multi Media Filter, Chlorine Contact Tank, Fencing Panels around the S.T.P. Yard, Steel Gate, Interconnecting Path, Railing and Access Ladder, Plant Building/ Chowkidar Room, manhole chamber, inspection chamber, etc. Drawing shall be prepared with AUTOCADD and nicely winded 04 (Four) copies of set of drawing shall be in hard & in soft format; complete in all respect as per directions of Engineer-in-Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards of pollution board authorities, like CPCB and HPPCB.
Prov and Fixing of 2500 KVA Oil Filled Copper wound Transformer Platform Electric Pole etc 152 MLD STP Balloke Ldh Under Jal Hi AMRUT
Providing & Fixing of 2500 KVA Oil Filled Copper wound Transformer Platform, Electric Pole etc. at 152 MLD STP Balloke Ludhiana (Under Jal Hi AMRUT 2.0)
Erection of 25KVA transformer and necessary electric installation for giving electric supply to 55 KLD STP fixed in GLR Sy No. 129, Belagavi Cantonment.
Erection of 25KVA transformer and necessary electric installation for giving electric supply to 55 KLD STP fixed in GLR Sy No. 129, Belagavi Cantonment.
Upgradation of Ductable Air Conditioning System at 3rd floor and M/s FSSAI office premises STP II building Salt Lake Sector V Kolkata 700091