Loading…
Loading…
18,356 results • Best match
Construction of water Treatment Plant Near Ichhapara Krischanachura Tree at Kulberia. Activity ID No - 110199164
eProcurement System of Government of West Bengal Created By: Bidhan Nandi Created Date/Time: 18-Feb-2026 10:30 AM Tender Title: Construction of water Treatment Plant Near Ichhapara Krischanachura Tree at Kulberia. Activity ID No - 110199164 Tender ID: 2025_ZPHD_977498_2
Construction Installation of Water Treatment Plant with Solar Power Connection for safe drinking water at Talibpur Paschim Daspara under Talibpur GP of Bharatpur II Development Block AAP No 08 2025 26 Activity ID 109747987 15thFC Tied of 2025
eProcurement System of Government of West Bengal Created By: Debabrata Deb Created Date/Time: 03-Dec-2025 09:11 AM Tender Title: Construction Installation of Water Treatment Plant with Solar Power Connection for safe drinking water at Talibpur Paschim Daspara Tender ID: 2025_ZPHD_941087_1
Water proofing treatment to the roof and front floor repairing at Para Sadan, OPF Kanpur
M&L FOR WATER PROOFING TREATMENT :- (i) Preparation of the surfaces of the roof by cleaning with wire brush, removing old treatment, if any. (ii) Brooming with Broom and finally sweeping with gunny bag. (iii) Filling the thin grooves with hot bitumen and allowing them to dry. (iv) Appmying a coat of hot bitumen of grade 85/25 @ 1.20 kg/Sq.mtr over the area even and smooth. (v) Unrolling the roll of Polymeric water proofing membrane over the coated surface and press smoothly to bond completely with the surface and no air bubble should be left under the membrane. The lap should not be less than 10 cm both horizontaly and vertically. The lap will not be measured separately. (vi) Lap should be sealed with flame and blown bnitumen thereafter. (vii) Applying the IInd layter of the hot bitumen of grade 85/25 @1.20 kg/Sq.mtr even and smooth on the polymeric membrane. (viii) Removing the debris off the campus. (ix) SPECIFICATION OF THE POLYMERIC MEMBRANE (a) The center core of the membrane should be 90 micron, with high modecular/high densityh polythelene film provided both side with SBS/APP polymer modified bitumen with properties of high softening point. (b) Top layer and botgtom layer - Therofusible high molecular/high density polythelene film. (c) Elengation - More than 300%. (d) Weight - 3.00 Kg/Sqm. (e) Thickness - 3 mm. (f) Make - Texsa India Ltd/IWL India Ltd/STP Ltd. (g) Softening point - More than 120 degree centigrade. (h) Should not break at Minus 15 Degree centigrade (ie - 15 C). (j) Should not drip at 100 Degree centigrade. (k) Applying a coat bituminous base aluminium paint over water proofing membrane. (l) The firm will ensure that no seepage occurs from the area on which water proofing has been done as per specification above. (m) The firm will provide a guarantee for 7 years from the date of completion.
Construction of arsenic free water treatment unit near Kali Mondir at Madhya Bachra under RBGP.
eProcurement System of Government of West Bengal Created By: MD HASIBUR RAHAMAN Created Date/Time: 17-Feb-2026 12:31 AM Tender Title: Construction of arsenic free water treatment unit near Kali Mondir at Madhya Bachra under RBGP. Tender ID: 2026_ZPHD_985300_5
Construction of water Treatment Plant Dhanchepara Near Mollar Manai Sk house. Activity ID No - 110208670
eProcurement System of Government of West Bengal Created By: Bidhan Nandi Created Date/Time: 18-Feb-2026 10:35 AM Tender Title: Construction of water Treatment Plant Dhanchepara Near Mollar Manai Sk house. Activity ID No - 110208670 Tender ID: 2025_ZPHD_977498_4
Repair of roof and water treatment of IV type qtr At cc Bikaner
Providing and Applying ACRYLIC emulsion polymer waterproofing chemical coating, on over roof on over roof slabs/terrace/balconies/parapet wall etc.with following method/specification:Paint the surface with regular paint brush so as to obtain approximately 0.3mm thickness coating. apply the 2nd coat next day at right angles to the 1st coat so that total thickness of the coating should be approximately 0.6mm coverage by using above formulation will be 40 ft2/ litre of chemical. painted surface does not require any external water curing since chemical will hold sufficient water for curing.After the primer coat Apply 2 coats of modified acrylic emulsion polymer water proofing compound having solar heat reduction properties coating @ 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work.