Loading…
Loading…
17,754 results • Best match
Improvement Works to the Sewage Treatment Plants ( 60 MLD) at Ondipudur Under AMRUT 2.0
STP - Analyzer COD – 0-2000 mg/l BOD – 0-2000 mg/l TSS – 0-2000 mg/l PH – 0-14
SPECIAL REPAIR/RPLACEMENT OF EVAC SEWAGE TREATMENT PLANT AT ACD DOCK ND (MBI)
M&L for cleaning of STP tank by mechanical flushing of treatment tankpreparation of tank by close all valves, isolate electrical power to pump and motor, drain the holding and treatment tank partially using the recirculation pump to a certified waste facility, ventilate the tank for 24 hrs and test with multi gas detector. Inspection visually sedmintation chamber, aeration diffusers and wall for scale, slime or residue, check PH and chlorine level in residual liquid, flushing chamber by pump and with fresh water or sea water with mild non corrosive cleaner for descaling, sedisediment removal by vacum pump via drain pump, use high pressure rinse for wall and diffusers. backwash diffusers with compressed air/water. Refill with clean water for priming resart the system in manual mode monitor effluent for 24 hrs and put record to office of Eng-in-charge complete all as specified and directed.
Repair/Servicing of OCMS at Sewage Treatment plant under GE (W) JRC
Clarifier Bypass arrangements at Sewage Treatment Plant in Namakkal City Municipal Corporation.
Improvement Works to the Sewage Treatment Plants ( 40 MLD) at Naanjundapuram Under AMRUT 2.0
STP - Analyzer COD – 0-2000 mg/l BOD – 0-2000 mg/l TSS – 0-2000 mg/l PH – 0-14
Repair and maintenance work of Chlorination plant at Sewage treatment Plant in Udumalpet Municipality