Loading…
Loading…
19,161 results • Best match
Supplying Chlorine Tonner Cylinder PAC and Bleaching Powder for all Water Treatment Plants of Vasai Virar City Municipal Corporation for F Y 2026 29
F.Y.2026-29 Supply of Chlorine Tonner, Cylinder, PAC and Bleaching powder at Water Treatment plant of vvcmc
Construction of Community Toilet near the house of Begam Khatun at Dastamara Village under Sekendra GP.
eProcurement System of Government of West Bengal Created By: PRANAB HALDER Created Date/Time: 26-May-2026 10:48 AM Tender Title: Construction of an Arcenic free water treatment plant beside house of Rejabul sk at Imamnagar village under Sekendra GP. Tender ID: 2026_ZPHD_1012358_2
CONSTRUCTION OF GRAY WATER MANGEMENT TREATMENT SYSTEM WITH COVER SLAB WITH SOAK PIT FROM NURJAL SK HOUSE TO JIKU SK HOUSE AT BASANTAPUR
CONSTRUCTION OF GRAY WATER MANGEMENT TREATMENT SYSTEM WITH COVER SLAB WITH SOAK PIT FROM NURJAL SK HOUSE TO JIKU SK HOUSE AT BASANTAPUR ID - 112855441
Inst. of Water treatment plant at Mallickpara h/o Ansar piyada within Sarberia Agarhati GP under SDK-I (APAS/01/123/41/0001)
eProcurement System of Government of West Bengal Created By: Md Monirul Sheikh Created Date/Time: 14-Jan-2026 02:01 PM Tender Title: Inst. of Water treatment plant at Mallickpara h/o Ansar piyada within Sarberia Agarhati GP under SDK-I (APAS/01/123/41/0001) Tender ID: 2025_ZPHD_951187_1
Providing and Laying Cement Based Water Proofing Treatment Coba on existing Roof Terrace of Govt. Model Sr. Sec. School, Sector-37D, Chandigarh
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment.(b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge.(d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including sandwitching chicken mesh of 26 gauge having mesh size ½"x½" in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm. (N.S.)
REPAIR TO RCC ROOF WATER PROOFING TREATMENT AND OTHER WORKS IN AOR OF AGE B R DOMESTIC AREA AT AFS PATHANKOT
M&L for preparation of surface by scrapping and properly cleaning the surface to remove loose particles/existing vegetation/roots etc with wire brushes and removing any type of of existing roof treatment in any layer alongwith existing plaster so as to reach up to top of RCC roof slab complete in all repsect,filling of cracks with smart care Hybrid PU Sealent wherever required and for rendering plastering work 10 mm thick in CM 1:3 on pcc padding and finishing the surface without using extra cement for application of roof treatment (A) Apply first coat of fibre reinforced elastomeric liquid water proofing membrane formulated with PU hybrid polymers and reinforcing acrylic fibres with sun reflectivity index (SRI) of 100-110, having minimum elongation of 350%, tensile strength 2.9 MPa and shall have crack bridging ability upto 2.5mm and shall resist 10 bars of hydrostatic pressure , reduce surface temperature upto 10 degree celsius with 33% dilution as primming coat.(b) Laying of fibre mesh of 0.3mm thickness weaven in leno pattern having weight 45 gm/Sqm and pasting it properly with overlap of 50mm and allow it to dry.(c) Apply second undiluted coat @ 0.450 ltr/Sqm (d) Apply third and final coat undiluted @ 0.450Ltr/Sqm in color combination/ cameoflauging pattern as directed by Engr-in-charge. Note : Application of water proofing treatment will be done Authorised applicator only/ or in presence of authorised rep. Certificate in this regard shall be submitted to Engr-in-charge. Shifting/removal of any wire/ cable/AC unit or any other object as per the site requirement and refixing of the same if needed is deemed to be included in rates quoted by contractor.