Loading…
Loading…
17,760 results • Best match
INTERCEPTION and DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR KURWAI TOWN
Design Engineering, Construction of Commissioning of 300 KLD Calacity Sewage Treatment Plant (STP), 30 KLD Capacity Effluent Treatment Plant (ETP) and Operation and Maintenance for 05 Years at Rajeev Gandhi General Hospital, Alwar
The SITC of Both Sewage Treatment Plant and Effluent Treatment Plant includes 05 Years of operation and maintenance All Parts and Machinery maintenance, Replacement included in 05 Year DLP. The Operation and maintanance of above STP/ETP will be for 05 Years which includes 24x7 operation of STP and ETP each by skilled operator, regular backwashing/cleaning, all Consumables and any other activity required for un-hindered operation of STP and ETP. The Payment of O&M cost will be done on quarter basis (after every 3 months) after getting report of outlet parameters matching with prevailing RPCB/CPCB norms. 3 % of SITC Work for first year
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Experienced service provider; Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant | Billing:monthly | Amount:8965008
Operating of Sewage Treatment Plant at Thermal Nagar for the period from 01.04.2026 to 31.03.2027
Charges for pumping of raw sewage from collection well into oxidation channel by operating the departmental pumps, operating of 4nos rotors in oxidation channel for treatment of sewage including operating of return sludge pump wherever necessary, operating of clear water pump for pumping of clear water into nearby area rate including cleaning and grease packing and other maintenance of all rotating parts of all rotors, pumps, etc. complete(Grease will be supplied by the department at free of cost)
SITC of 300 KLD Sewage Treatment Plant and 30 KLD Effluent Treatment Plant (Including 05 Years DLP and O and M) at State Cancer Institute, Pratap Nagar, Jaipur
The SITC of Both Sewage Treatment Plant and Effluent Treatment Plant includes 05 Years of Defect liability peroid). All Parts and Machinery maintenance, Replacement included in 05 Year DLP. The Operation and maintanance of above STP/ETP will be for 05 Years which includes 24x7 operation of STP and ETP each by skilled operator, regular backwashing/cleaning, all Consumables and any other activity required for un-hindered operation of STP and ETP. The Payment of O&M cost will be done on quarter basis (after every 3 months) after getting report of outlet parameters matching with prevailing RPCB/CPCB norms.
Laying of LT cables and associated works for Lift stations and Sewage treatment plant