Loading…
Loading…
17,760 results • Best match
Manning and operation Sewage Treatment Plant STP at Chieswema Grn Nagaland
PROVISION OF SEWAGE TREATMENT PLANT (STP) AT NEW MILITARY STATION KAPURTHALA
COMPREHENSIVE MAINT OF SEWAGE TREATMENT PLANT A B AT INS RAJALI ARAKKONAM UNDER GE M ARAKKONAM
Comprehensive maintenance of sewage Treatment plant of cap 280 KLD installed at Site 'A' at Arakkonam comprising the following assets, including all associated civil structures, chambers, connected equipment, control panels, cabling, complete all as specified and as directed: Raw Sewage collection well - 01 No, Equity tank - 1 No, Bar screen chamber - 1 No, MBBR based Aeration tank- 1 No, Primary clarifier tank - 1 No, Secondary clarifier tank - 1 No, Filter feed tank - 1 No, Treated water tank - 1 No, Sludge holding tank - 1 No, Sludge drying bed with 04 compartment - 1 No, Submersible sewage cutter pump – 3 HP, 3 phase, 415 V – 04 Nos, Air blower – 7.5 HP, 3 phase, 415 V – 02 Nos, Rake arm Assembly with Gear Box and motor of cap 2 HP each in primary and secondary clarifier - 02 Nos, Reactivated Sludge monoblock pumpset of cap 1 HP - 2 Nos, Filter feed monoblock pumpset of cap 05 HP - 02 Nos, Filter press feed pumpset 1.5 HP - 02 Nos, Hydraulic filter press system with motor 01 HP - 1 No, Treated water monoblock pump set – 15 HP, 3 phase, 415 V – 02 Nos, Pressure Sand filter unit – 01 No, Activated carbon filter - 01 No, Chlorine dosing pump - 2 Nos, and Including maintenance of all electrical, mechanical, instrumentation components, control panel boards including MCCBs, starters of any type & size, cables, connected accessories, and all incidental works necessary for proper functioning of the STP.
Clearing the Scrub Jungle in around Sewage Treatment Plant 1 area at Analmin Nagar
Design and Construction of Water Supply, Sewerage System and Sewage Treatment Plant, House Service Connections and Allied Works with 5 Years Operation and Maintenance Period in Jyotirmath Town, Chamoli District, Uttarakhand
Construction of 32 KLD Co Treatment Plant of Fecal Sludge and Septage with Sewage at existing 7 MLD STP Ramnagar
Design, Engineering, Construction, Erection, Testing & Commisioning of 32 KLD Co-Treatment plant of Fecal Sludge and Septage with Sewage near existing 7 MLD STP, Ramnagar based on open technology including all Civil & Electro-Mechanical works, Automation etc. complete including the cost of excavation, supply, laying, jointing & refilling of trenches of Conveyance main (RCC NP3 pipe) upto Raw Sewage Pumping Station of existing STP (Approx. length = 100 m) alongwith construction of required size & quantity of Manholes (Brick masonry), dismantling and reinstatement of CC road, arrangement of water for dilution purpose etc. complete on turnkey basis.