Loading…
Loading…
17,755 results • Best match
CO entrance ramp for tractors for sludge disposal facility and paved path from sludge de-watering unit to Sludge de-watering bed Under SBM G
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm.layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
Providing installation and commissioning of solar deactivation unit Under SBM G
Providing and fixing informatory boards SBM G
Providing and fixing informatory road sign board fabricated with MS square pipe frame, welded using arc welding technique, complete with proper bracing, stiffeners and supports. The display panel shall be made of Aluminium Composite Panel (ACP) sheet of size 4 feet × 6 feet, duly fixed to the frame. High-intensity reflective tape/retro-reflective sheeting shall be pasted over the ACP panel for enhanced visibility, conforming to relevant IRC/MoRTH specifications. The total height of the sign board shall be 10 feet including supporting frame. The board shall be erected vertically, properly aligned and firmly fixed at site, including foundation/anchoring, bolts, nuts, clamps, painting/anti-corrosive treatment and all incidental works. The work shall be completed in all respects to the satisfaction of the Engineer-in-Charge.
Providing and fixing Informatory boards. Job No. 2
Providing and fixing informatory road sign board fabricated with MS square pipe frame, welded using arc welding technique, complete with proper bracing, stiffeners and supports. The display panel shall be made of Aluminium Composite Panel (ACP) sheet of size 4 feet × 6 feet, duly fixed to the frame. High-intensity reflective tape/retro-reflective sheeting shall be pasted over the ACP panel for enhanced visibility, conforming to relevant IRC/MoRTH specifications. The total height of the sign board shall be 10 feet including supporting frame. The board shall be erected vertically, properly aligned and firmly fixed at site, including foundation/anchoring, bolts, nuts, clamps, painting/anti-corrosive treatment and all incidental works. The work shall be completed in all respects to the satisfaction of the Engineer-in-Charge.
REPAIR AND MAINT OF PUMPS AIR BLOWERS MACHINERY TUBE SETTLER MEDIA FAB MEDIA MS LINE AND OTHER MISC ITEMS OF SEWAGE TREATMENT PLANTS IN THE AREA OF AGE(U) WATER SUPPLY NO-III UNDER GE(U) WATER SUPPLY DELHI CANTT-10
M&L for periodical cleaning of sewage and removing of settled down sewage sludge cum mud/de-silting etc at for equalization tank of 2MLD plant at Shankar Vihar STP complete all as specified and as directed.
operation maintenance and repair work of sewage treatment plant stp of phase 1-21 mld and phase 2-20 mld capacity at cahorli 2026_29
Operation maintenance and repair work of sewage treatment plnat stp of phase 1 -21 MLD and phase 2 - 20 MLD capacity at charoli (2026-29)