Loading…
Loading…
17,871 results • Best match
Operation and Maintenance of SBR based Sewage Treatment Plant of 24 MLD capacity at Etah with Main Pumping Station and 6 MLD Intermediate Pumping Station
Comperehensive Repair & Maintenance of all E/M equipmets (Screens, Pumps, D.G. Sets, Transformers, Blowers, Decenter, Diffuser, Chlorinator, L.T. & H.T. Panels, PLC Panels & instruments etc complete) of STP, MPS & IPS including SCADA, consumables (diesel, lubricants, gear oil, chlorine gas, Poly Electrolite) and lighting.
as per tender documents
CONSTRUCTION OF BRIDGE OVER GADHI RIVER FROM FINAL PLOT NO. 506, PANVEL SIDE TO KARANJADE SEWAGE TREATMENT PLANT NEAR URAN -PANVEL HIGHWAY.
Interception Diversion of Nallahs with STP works Project of Betul Bazar town under SBM 2.0
Construction of Interception and Diversion work for 12.4 km length for Sewage Treatment Plant under SBM 2.0 at Gudalur C Municipality Coimbatore District
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers. Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary soil.SS20B(160MM DIA PVC PIPE)
Operation and Maintenance of FRP based packaged Sewage Treatment Plant to handle hospital sewage of 25 KLD at Golden Jubilee Hospital, Visakhapatnam Port Authority for a period of 5 years 2nd Call.
Replacement Repairand Upgradation Works including 1.8 MLD Ultrafiltration System Ozone System Pumps Pipelines and Online Analysers at 4 MLD Sewage Treatment Plant STPIIT Madras Chennai36
Supplying, installation, testing and commissioning of Ultrafiltration (UF) system of 1.8 MLD capacity in Sewage Treatment Plant (STP) at IIT Madras, including dismantling and replacement of existing UF system, complete, all as specified and as directed by the Engineer-in-Charge. The UF system shall comprise SS-304 fabricated UF skid of approximate size 5.20 m × 2.70 m × 1.80 m, complete with 22 Nos. UF membrane modules of 280 mm diameter and 2081 mm (±5 mm) height, including SS double acting pneumatic actuated valves (1 No. 10" dia and 4 Nos. 6" dia), ½" dia SS air piping up to 10 m, SS-304 interconnecting pipelines, fittings, supports, pressure gauges and SS fasteners, etc., complete. The item includes dismantling, removal and disposal of existing UF skid and membranes as per prevailing statutory provisions, integration with existing SCADA system, testing, commissioning, trial run and handing over, complete in all respects as per Annexure-I specifications, approved drawings and instructions of the Engineer-in-Charge.