Loading…
Loading…
17,951 results • Best match
REPAIR REPLACEMENT OF INTERNAL ELECTRIFICATION AND MISC CONNECTED ITEMS IN RESPECT OF MD OTM ACCN AT BANASWADI PRTC MEG CENTRE AND OTHER AREA AND REPAIRS MAINT OF SEWAGE TREATMENT PLANT AT TB III UNDER GE NORTH BANGALORE
Dewatering and pumping out of existing treated water tank and CCT at STP by using external sewage disposal pump set to near by sewage disposal drain and cleaning of tank by scrapping with wire brush or any other means of on walls and bottom of tank and removing the sludge/ slits/ sand/fungus etc deposited inside the sumps/ tanks with buckets and depositing where directed followed by cleaning with bleaching water solution and fresh water and finally applying one coat of snow cem on internal and external surfaces including writing "Tank Cleaned (date) and due date with 10Cm size white colour letter" on Black back ground on external walls complete all as specifoed and direted. Location : Banaswadi Garrison
Surveying, Planning, Designing, Construction and Commissioning of 0.10 MLD Capacity Sewage Treatment Plant based on SBR Technology....including O and M for 05 years at Dharam colony of Chhal OCP, Raigarh Area of SECL on Turnkey Basis. (Ref NIT)
Survey, Planning, Designing , providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of Cyclic Activated Sludge Process Based(CASP) on Sequencing Batch Reactor (SBR) Technology,STP consisting of Raw Sewage Sump, Sump Pump House, Plant Room, Screen Chamber, Grit Chamber, Inlet cum Equalization Tank, Aeration Tank (SBR), Disinfiction Tank,Sludge Sump and other Miscellaneous Civil works with necessary piping work including required valves, gates, drains, pathways etc.complete as turnkey job with all invoved Civil, Electrical and Mechanical works inclusive of following items, units as per specifications for Civil, Electrical and Mechanical components with all duties and taxes etc. complete to achieve pH around 7.0, COD 50 mg/l, BOD 10 mg/l, Suspended Solids 10 mg/l, Fecal Coliform 1000 MPN/100ml. All structural steel works/ fabrications are to be provided, with applicationof hot dip zinc coating according to specifications as per IS 4759 : 1996 (Reaffirmed 2006) as per Scope of Work and Technical Specification including Operation and Maintainance of (Five) years.
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 3.8 MLD RAW SEWAGE PUMPING STATION AND 3 MLD SEWAGE TREATMENT PLANT BASED ON SBR TECHNOLOGY FOLLOWED BY OPERATION and MAINTENANCE FOR 3 YEAR AT SANQUELIM, GOA
Supply Installation Testing and Commissioning of necessary machinery along with execution of allied civil works for the required improvements at the Sewage Treatment Plants located at Kasarwadi Phase 1 2 3 Sangvi and Kudalwadi under the Jal Hi Amrut
Supply installation testing and commissioning of necessary machinery along with execution of allied civil works for the required improvements at the sewage treament plants located at kasarwadi phase 1 2 3 sangvi and kudalwadi under the Jal Hi Amrut initiative
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - onboard INS Ships; RRC FOR REPAIR/MAINTENNACE OF STP OMNIPURE MAKE SEAWAGE TREATMENT PLANT FITTED ONBOARD INS SHIPS; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - onboard INS Ships; RRC FOR REPAIR/MAINTENNACE OF STP OMNIPURE MAKE SEAWAGE TREATMENT PLANT FITTED ONBOARD INS SHIPS; Service Provider
Design, Supplying, Erection, Testing and Commissioning of Mechanical, Electrical works and construction of Civil works of Sewage Treatment Plant for Rangit Dam Site