Loading…
Loading…
1,942 results • Latest
SPARE PARTS OF KRAZ 255B (LRC)
CAUSTIC CLEANING & ASSEMLING OF SUB ASSY PART NO -
Repairing and Re-winding of 05 Nos. 15 H.P. 3 phase Submerssible Motor of Different make and repairing of Submerssible Pump Bowl Assembly suitable for capacity of 100 Cum/hr. Against a total head of 50ft. To 85 ft. Of under Barasat (AM) Division
Dismantling of different H.P. 2800/2900/3000 RPM submersible motors removing old burnt out coil from slots carefully, segregating all the parts, washing and cleaning the same thoroughly for verification of serviceable and unserviceable parts as per direction of Engineer –In-Charge. (ii)12.5 H.P. /15 H.P. Submersible motor.
Construction of C.C road from Ketab Mandal House towards Asharaf Hossain Pond at Mouza Bithari San-VIII under BHGP.
Restoration and upgradation of bituminous road in between CB block and CC block beside P and T Quarter and inside P and T Quarter (B,C,G,F block) within ward no - 40 under Bidhannagar Municipal Corporation. (Fund -15th F.C (untied)Fund)
Relaying disturbed channel stone on new lime concrete (18 : 36 : 100) bed up to 75 mm thick.
Construction of concrete road entire inside area of cluster IV of Purbachal Housing and repairing and upgradation of --- with parking places IA-33 to 37, IA- 299 and other places ward no - 37 under BMC. (Fund -Councillor Fund 2026-27)
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Construction of concrete road including drain from (i) h/o. Bapi Mitra to h/o. Madhab Sandhukha ----- h/o. Kanu nandi to h/o. Indrajit Basu in ward no -17 under Bidhannagar Municipal Corporation. (Fund -Councillor Fund 2026-27)
Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance.