Loading…
Loading…
1,604 results • Latest
Provision for Jungle cutting including removal the same from the vacant plot (allotted or non allotted) throughout the year as a precautionary measure for prevention of spreading dengue and snake breading at Action Area I, New Town, Kolkata
BRIDGE ON THE ROAD NAMELY T03-BITHARI FOOTBALL GROUND TO MALLIKPUR OVER SONAI RIVER UNDER SWARUPNAGAR P.S.
Supply, Installation, Testing, Commissioning of CCTV Surveillance System at Different Locations at Pandua, Hooghly Sadar Subdivision under MP LAD Scheme. (1st Call)
Electrical works including installation of Air Conditioning system in the FA setup, North Block, 8th Floor, Bikash Bhawan, Salt Lake, Kolkata-91-----Electrical Installation Works
Removal of existing mat, dismantling of wood work EVA cushion installation and re- installation of old mat in badminton court Taruner Swapno Indoor Sports Complex in Bhairab Ganguly College, under Kolkata North Division PWD. during the year 2026-27
PROVN OF 05X TOILET NEAR JCOs MESS AND OR LINES, PROVN OF RECEPTION CUM SENTRY POST AT MAIN ENTRANCE, PROVN OF SHED ALONG COOK HOUSE, PROVN OF LIGTNING CONDUCTOR AND PROVN OF EARTHING, LIGHTNING ARRESTOR AT BARRACKPORE UNDER GE BARRACKPORE
Professional Consultancy Services for Preparation of Detailed Project Report along with Detailed Engineering Documents for the Proposed Construction of IT Park Phase IV at Paribahan Nagar Matigara Siliguri District Darjeeling.
Renovation and Repairing works for Flat No 403 G_10 RHE Swayambhara at Salt Lake repair and painting all rooms modification of wardrobe in kitchen and extension of shoe rack with some S and P works
Extension of Apron on south side of International Terminal Building and allied works at NSCBI Airport Kolkata.
Setting up of State Project Management Unit SPMU, PHE Department, West Bengal under Jal Jeevan Mission 2.0