Loading…
Loading…
1,566 results • Latest
Renovation and modification of existing electrical installation including replacement of existing fittings-fixtures and arrangement of plug point with allied electrical works at ART Centre of Barasat Government Medical College and Hospital in North 2
ASCERTAIN THE RATE PER MT OF 95 GSM , 61 CM, CONQUEST PAPER
Supply of new 110 pcs Tyres, 50 pcs Tubes and16 pcs Flaps
Rewinding of 15 nos 17 point 5 HP to 20 HP 3 phase submersible motor of different make and repairing of submersible Pump Bowl Assembly Against a total head of 50ft to 85ft of different make under Barasat AI Divn during 2026 27
Renewal of back to back OEM support upgrade for existing Core Network infrastructure of the Directorate of Commercial Taxes,GoWB.
Comprehensive renovation and upgradation of Firefighting System at Vidyut Bhavan, Salt Lake as per WBF and ES Fire Safety Recommendation Design Supply Delivery Installation Commissioning Obtaining FSC
ASCERTAIN THE RATE OF LOW TEMPERATURE PIGMENT FREE HOT MELT BOOK BINDING ADHESIVE
Rig dismantling, rig building and other electrical work during ILM of Rigs BI-2001 and E-2000-IX at drill sites BPONN054RNB-B, BPONN054RNB-D and BPONO181MPA-D