Loading…
Loading…
434 results • Latest
FURNISHING WORK INCLUDING CIVIL WORKS AND ELECTRICAL WORKS
Preparation and submission of Detail Report on conducting Falling Weight Deflectometer FWD Test as per IRC 115 2014 for over laying Design including all complied data sheet as per the direction of Engineer in Charge for Usthi Serakole Road
Miscellaneous electrical spares of various types and categories
Auliapur Uttarbhag Road, from 0.000 kmp to 10.000 kmp for the work of Strengthening existing carriageway from 5.5m with reconstruction of culverts, protective works, drainage work in the District of South 24 Parganas, under South 24 Parganas Divn
Canning Dock Ghat Auto stand Tiger Project office to Uttar Taldi Janakalyan More road, from 1.000 kmp to 2.500 km for the work of Strengthening carriageway 7.0 m from 2.500 km to 8.100 km for the work of Strengthening and Widening
Back side Land Development of existing emergency building and Hostel cum Messing New 3 storied building of BPHC in the district of South 24 Parganas during the year 2026 2027
Arrangement for proper waste water disposal from the existing Emergency and outdoor building along the road side of the building of Hariharpur BPHC Hospital during the year 2026 2027
Supply loading at factory and transportation of LT DISTISTRIBUTION BOX and EYE HOOK for Anchor and Suspension Clamp and LT DISTISTRIBUTION BOX for 63 KVA DTR with Double Feeder to Garia Divisional store WBSEDCL
Supply of AutoCAD - including specialized toolsets AD Commercial New Single-user ELD Annual Subscription for 8 users for the duration of 1 year for Rajpur Sonarpur Municipality.