Loading…
Loading…
576 results • Latest
Electrical work in connection with "Improvement of old and damaged wiring & other associated work at Kanha Rest House, Mathura.
CONSTRUCTION WORK OF BRACHYTHERAPY IN EXISTING LINAC BLOCK AT LADY LOYEL CAMPUS AT DISTRICT - AGRA (U.P.).
REPAIR TO SEWAGE LINE, MANHOLES, SEPTIC TANKS, SOAKAGE WELLS UNDER AGE B/R-II (W) OF GE (W) AGRA
Deployment of DGR Security Guards at FCI Agra
REPAIRS TO CERTAIN B/R NATURE WORK AND ANOTHER ALLIED WORKS FOR OTM ACCN AT AGE B/R-I UNDER GE (W) AGRA
Hariparvat Zone Construction of RCC drains on both sides and covering of the drain from Master Plan Road to RBS Crossing.
Hariparvat Zone, Ward No. 10 Work involving the installation of a mesh/grating over the drain and culvert, as well as work on the drain wall, near the Budhan Sayyad Sheikh Basti railway track and the Municipal Corporation Girls Inter College.
Hariparvat Zone, Ward No. 44 Work of laying underground RCC pipes near Al-Ali Hotel on the road leading to the New Agra Abbulala Dargah.
Hariparvat Zone Construction of an RCC drain from Mukesh Goyal shop (near the Tota-ka-Tal Phool-wale intersection) to Kirti Mobile Shop.
Hariparvat Zone Construction of drains on both sides and earth-filling work, extending from Kuldeephouse in Chandan Vihar (K.K. Nagar) to Gyanendra house, passing via Ashok house.