Loading…
Loading…
588 results • Latest
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs and Parks) on Delhi-Agra Section on NH-2 from Km. 16.100 to Km. 20.500 in Delhi and Haryana on Item Rate (Percentage) basis.
Dismantling , Carriage and Erection work of 10 MVAR Capacitor Bank at 220 KV S/S Firozbadad and132 KV S/S Narkhi under ETD Firozabad
Construction of 33 KV Jal Jeevan Mission Bay at 132 KV S/S Narkhi under ETD Firozabad
Replacement of Zebra Main and Transfer Bus to Moose Main and Transfer Bus at 132 KV S/S Foundry Nagar under ETD-II Agra
Handling and Transport on Lumpsum Basis - Transport Service, PROJECT OFFICE, AGRA
52kV, 3150A RIP Bushing with metal parts and Gaskets as per POWERGRID TS for NER, 52kV 3150 A RIP or RIS Bushing solid Stem with Metal Parts and Gasket for NR-III, 52 KV 3150 A LV RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-I, 52 KV 3150 A RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-II, 52kV 3150A, RIP or RIS Bushing Solid stem With Metal Parts And Gaskets for NR-II, 3150 Amps RIP or RIS bushing Solid stem type with metal part and gasket for Odisha, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for WR-I, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for ER-I
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.