Loading…
Loading…
3,923 results • Latest
KIRLOSKAR MAKE ASH WATER PUMP PART NO.1200101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.1330101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.1860101, KIRLOSKAR MAKE ASH WATER PUMP PART NO. 1900101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2360101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2380101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2450101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2450102, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2450202, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2470101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.2770101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.3100101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.3110101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.3110201, KIRLOSKAR MAKE ASH WATER PUMP PART NO.3120101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.3170101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.4000101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.4040101, KIRLOSKAR MAKE ASH WATER PUMP PART NO.4750101, KIRLOSKAR MAKE ASH WATER PUMP PART NO. 3690101
Membrane Pilot Plant Unit, Thermal Condutivity of Insulating Slab, Parallel Flow Counter Flow Heat Exchange, Pool Boiling Apparatus, Open Pan Evaporator, Dropwise and Filmwise Condensation Apparatus, Lab-Scale Gasification Unit
6.4 V 100 AH LiFePO4 Battery
Megaphone-Loud Hailer (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2026/B/7161336 Dated : 28-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 13355 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
HRC Fuse as per IS 13703 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7157667 Dated : 28-01-2026 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 113715 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : The Managing Director GUJARAT, NA, Gujarat Metro Rail Corporation Limited, Ministry of Housing & Urban Affairs (MoHUA) (Gujarat Metrorail Corporation Ltd.)
Non Asbestos K Type Brake Block