Loading…
Loading…
942 live484 closing this weekmost from North Western Railway and Department Of Military Affairs
942 results • Latest
Construction of Proposed Boundary wall around M.D.S. University Land, Ajmer (3.50 Km.) (Excluding cost of cement)(Phase-II)
Water Proofing work Saraswat Bhawan and Kanad Bhawan and Repair and Renovation work at Saraswat Bhawan, M.D.S. University, Ajmer
ICE CREAM, FLOVERED MILK AND CASH COLLECTION WORK AT AJMER RURAL AND CITY AREA THROUGH REFRIGRATED VECHICLE
COMPREHENSIVE DAY TO DAY B/R WORK OF CERTAIN MD JCOS/OR QTRS AT AJMER SINGH ENCLAVE AND PATHAK ENCLAVE UNDER GE(I) GOS
ALL INSIDE MENISCUS REPAIR IMPLANT KIT FOR LARGE MENISCAL TEAR USING PTF TECHNIQUE CONSISTING OF SURESTITCH EQUIVALENT COMBO DEVICE -1 SET
Implant for ACL reconstruction set consisting of ACL tight rope RT -1 ,biocomposite interference screw 1, and Fiber wire - 2 -
IMPLANT FOR TOTAL KNEE REPLACEMENT SET HI FLEX KNEE CONSISITING PRIMARY KNEE REPLACEMENT FEMORAL COMPONENT HI FLEX 1 ,PRIMARY KNEE REPLACEMENT SYSTYEM TIBIAL COMPONENT TITANIUM ALLOY COATED 1, PRIMARY KNEE REPLACEMENT SYSTEM INERT 1
PROVN OF APPROACH PATH FOR CERTAIN MD ACCN IN AJMER LINE AND PROVN OF HARDSTANDING AT FIELD WKSP COMPANY UNDER THE AREA OF AGE B/R-I OF GE (ARMY) No 1 JODHPUR.
SHOULDER INSTABILITY REPAIR SET CONSISTING OF CEPTRE EQUIVALENT PEEK ANCHOR 4.8MM, DOUBLE TAP-2,PEEK VIPLOCK EQUIVALENT KNOTLESS ANCHOR 5.5MM SELF TAP SCREW-1
ALL INSIDE MENISCUS REPAIR IMPLANT KIT FOR LARGE MENISCAL TEAR USING PTF TECHNIQUE CONSISTING OF SURESTITCH EQUIVALENT COMBO DEVICE -1 SET
IMPLANT FOR TOTAL KNEE REPLACEMENT SET HI FLEX KNEE CONSISITING PRIMARY KNEE REPLACEMENT FEMORAL COMPONENT HI FLEX 1 ,PRIMARY KNEE REPLACEMENT SYSTYEM TIBIAL COMPONENT TITANIUM ALLOY COATED 1, PRIMARY KNEE REPLACEMENT SYSTEM INERT 1
Implant for ACL reconstruction set consisting of ACL tight rope RT -1 ,biocomposite interference screw 1, and Fiber wire - 2 -
Package No RJ-01/Kekri/BA 2026-27/Point No 296.92/30 Crore/06/Part II
Package No RJ-01/Kekri/BA 2026-27/Point No 296.92/30 Crore/06/Part I
Hydrophobic Foldable Posterior Chamber IOL - Single Piece with 2 haptics, Spherical, Biconvex, Optic Size - 5 to 7mm, Assorted Refractive Power in Dipter (6.0D to 30.0D) (EDOF )Extended depth of focus +2.0 D
Construction of new building at GPS SKS Madanpura Block Arain Distt Ajmer
Construction of new building at GPS Amarpura Block Masuda Distt Beawar
Washing Machine Repair, RO Repair water level sensor and Filter Change, Fly Catcher Repair, RO Repair Filter Change, Legal Paper
Ice Cream and FMP Product Supply
Wall Painting in Ajmer Beawar District
Package No RJ-01/Kekri/BA 2026-27/Point No 296.92/30 Crore/06/Part I
Package No RJ-01/Kekri/BA 2026-27/Point No 296.92/30 Crore/06/Part II
Construction work of Satellite Hospital at Kotda Distt. Ajmer (SITC of Air Conditioning and Air Cooling work)
Construction work of Sub District Hospital Bijaynagar Distt. Beawar (Exernal Electrical work)
Construction work of New CHC Building at Pisangan District Ajmer (DG Set Work)
Construction work of Satellite Hospital at Kotda Distt. Ajmer (SITC of Electric Sub Station work)
Construction work of Satellite Hospital at Kotda Distt. Ajmer (SITC of Fire Fighting work)
Construction work of Sub District Hospital Bijaynagar Distt. Beawar (H.V.A.C. Work)