Loading…
Loading…
58 results • Latest
Television (V3) (Q2)
Fire Fighting System on Lumpsum/Turnkey Basis
Reconstruction of the total compound wall RCC including dismantling the old damaged compound wall load bearing at Telhara Post Office under Akola Division
Providing skilled manpower services for 2-year operation and maintenance of 33 K/6.6 KV 1x4 MVA and 2x1.6 MVA, transformer, auxillary Transformer and switchyard equipments of switchyard for Ghungshi Lift Irrigation Scheme and 33 Kv Line from switchya
Shifting of 33 Kv HT Line obstructing the construction work of residential and office buildings at Jigaon Project Colony, Shegaon in the jurisdiction of MSEDCL Shegaon D/c of MSEDCL Shegaon Sub Division of MSEDCL Khamgaon Division and Handing over to
Video Conferencing Camera/Web Camera (V2) (Q2)