Loading…
Loading…
194 results • Latest
Annual Plan-PRO NO.61/26 RENOVATION OF HOMEO HOSPITAL WARD 15-MUHAMMA GP
Annual Plan-Pro.149/2026, Maintenance of Ayurveda Hospital - Improving basic facilities-Muhamma.G.P
Annual Plan-PRO NO.128/26 RENOVATION OF SUBCENTERS-MUHAMMA GP 2025-26-
GENERAL-KIP(RB) Rectification work in Pallickal Distributory-Budget Provision 2025- 26 -Desilting and Relining of Open Canal in Pallickal Distributary Chainage Between 2019.00m-2280.00m Near Panayil-General Civil Work
GENERAL-W and C Hospital Alappuzha - Urgent repair work in the old DMO building and PPS ward opposite to administrative block-2025-2026-General Civil Work
GENERAL Thenmala MS2Action Plan Works KIP RBMC Patch work, Painting, Replacement of wire rope and overhauling of hoisting mechanism for escape shutter at ch5600m of vallikkunnam distributory General Mechanical Work
GENERAL Thenmala MS2 Action Plan Works KIP RBMC Patch work, Painting, Replacement of wire rope and overhauling of hoisting mechanism for Flush escape at tail end of RBMC General Mechanical Work
Standardization of transformers at various locations under Electrical Section Kollakadavu
Entry and Mid Level Laptop - Notebook (Q2) ( ( 3 3 ))