Loading…
Loading…
676 live303 closing this weekmost from Directorate of Local Bodies UP and Chief Engineer Aligarh Zone PWD Aligarh
676 results • Latest
Customized AMC/CMC for Pre-owned Products - services; C ARM MACHINE (KIRAN); Comprehensive Maintenance Contract (CMC); Quarterly; No
Custom Bid for Services - Replacement of various 132 KV Control panel & 63 MVA T/F, 40 MVA T/F-2 C&R Pannel & 33 KV tripple feeder panel and 33 KV Capacitor bank panel at 132 KV S/s Boner under ETD-I Aligarh Similar Category Operation And Maintenance Of Substation
Construction of Roof Top Rain Water Harvesting Residential Building Malkhan Nagar Colony In District Aligarh (2 Nos)
Construction of Roof Top Rain Water Harvesting Residential Building Hydil Colony In District Aligarh. (2 Nos.)
Construction of Roof Top Rain Water Harvesting Non Residential Building Phase-1 Awas No-1, 2, 3, 4, 5, 6, 7 and 8 In District Aligarh
Construction of Roof Top Rain Water Harvesting Residential Building PWD Colony at PD Compund In District Aligarh
Construction of Roof Top Rain Water Harvesting Residential Building CMO Compund In District Aligarh (2 No.)
Construction of Roof Top Rain Water Harvesting Non Residential Building Phase-2 Awas No-1, 2, 3, 4, 5, 6, 7 and 8 In District Aligarh
Construction and beautification of the approach road to the Sadan Bhavan using CC (cement concrete).
Shifting of Lines and material for Ramghat road widening from Tarun Velly to Royal Homes under MDR-105 on Semi Turn-key Basis under the area EUDC, Aligarh
Patch repair work on Various Roads of Block- Gangiri
Patch repair work on Various Roads of Block- Akrabad
Patch repair work on Various Roads of Block- Dhanipur
Annual Maintenance work for one year at I.A. Talanagri Sector-1, 2 and CDF Complex, Distt-Aligarh.
Construction of G.S.B. And W.M.M. Work at 04 Lane Flyover at Etah Chungi Chauraha on Kanpur - Ghaziabad Marg (G.T. Road) in District Aligarh (U.P.)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Light Weight Ground Sheet (Tpo Coated) asper MHAspecification (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; VPI REWINDING OF HT MOTORS AT EMD-I, DTPS, HTPP, KASIMPUR, ALIGARH FOR 02 YEARS; Service Provider
Hiring of Consultants - Milestone/Deliverable Based - Laboratory NABL Accreditation; Contract Management, Laboratory Accreditation, Subject Matter Expert; No; Hybrid(As specified in scope of work)
Customized AMC/CMC for Pre-owned Products - AMC of chimney elevator; Alikraft Engineers pvt ltd; Annual Maintenance Contract (AMC); 45 days; No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - IN THE AREA OF EUTD-2 ALIGARH; Electrical System or Installation; Service Provider
Supply of 33 KV Circuit Breaker Vacuum interrupter
PRINTING ITEMS
(Continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. Schedule-A- b/w Aligarh Jn.Stn and Harduaganj Stn.Schedule-B- Shifting of NCR Transmission Line between Aligarh Jn.Stn and Daud Khan Stn
Construction work of the Veer Shiromani Maharana Pratap Park in Gabhana (Part A)
Construction of Platform and G.I. Chain Link Fencing for Static Cryovessel at Pashu Chikitshalay Chandaus District aligarh
Renewal and Repair of service Road of Boner Mr. From km. 0.000to km. 1.850
Renewal and Repair of service Road of Bhavankheda Mr. From km. 0.000 to km. 1.500
Work for the renovation of the internally damaged road of Nalkoop colaony Banna Devi
Renewal and Repair of service Road of Harduaganj Dy. From km. 10.920 to km. 13.000
Renewal and Repair of service Road of Daupur Mr. From km. 0.640 to km. 2.800
Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 12.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 15.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 17.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 20.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 22.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 25.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 27.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 30.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 35.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 40.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 45.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 50.0 H. P
Suitcasewith Trolley (CRPF) (Q2)
MSM Training System and Regenerative Braking Trainer and
Construction of multipurpose seed store and technology dissemination center at chandaus in District Aligarh U.P.
CONSTRUCTION OF MULTIPURPOSE SEED STORE AND TECHNOLOGY DISSEMINATION CENTER AT AKABARABAD DISTRICT ALIGARH UP
Regarding the task of capturing red-faced monkeys within the limits of the Aligarh Municipal Corporation and releasing them at a safe location away from inhabited areas.