Loading…
Loading…
3,872 results • Latest
NIRMAN WORK
NIRMAN WORK
NIRMAN WORK
NIRMAN WORK
R.B.SINGH & COMPANY SEALKIT COMPLETE FOR Double-acting Pneumatic Cylinder, Model: AC-D-MF1-SU- 100/210, MAKE - Neles (By, PNEUMATIC CYLINDER Model: AC-D-MF1-SU-100/210, MAKE - Neles (By Valmet) , Double-acting Pneumatic C
LED Luminaire For Road And Street Lights Conforming To IS
M/S MICRO INSTRUMENTS AND CONTROL SYSTEM Signal Isolator, Model-9000c, Dual Output, Supply Voltage: 24 VDC, Make-Masibus, Level Indicator, Model-LC5296H, Supply Voltage: 24 VDC, Make-Masibus, Temp. Indicator, Model- LC5296H, Supply Voltage: 24 VDC, Make-Masibus
Industrial Lock Assembly for Ceiling of LHB Coaches to RCF Drg. No. LW44318, Alt. c for DPC/DETC.
soclean Single-use sharps container Brand: soclean (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687727374283 dt.30/07/2026)
Barakaka men main road se interlocking tak interlocking marg ka nirman karya.
Nagla devi men ram pravesh ke ghar se main road tak interlocking marg ka nirman karya.
Bamnoi men sooeyavir ke gate se interlocking marg nirman karya.
Sarswati vidhya mandir inter collage munshi gajadhar singh labour colony hathras men interlocking nirman karya.
Akarabad men kodiyaganj road se surendra chauhan ke ghar tak interlocking marg nirman karya.
Boner men mandir se mukesh ke ghar tak interlocking marg ka nirman karya.
Rahasupur men pathawari mandir se nannu pandit ke plot tak interlocking marg ka nirman karya.
Gram Bauner men ramesh ke ghar se jugendra ke ghar tak interlocking marg nirman karya.
Gram Udaypur men dawar road se atul ke ghar tak interlocking marg ka nirman karya.
Construction of MDM Shed and Guard room at composite school Bahapur block Sahawar district Kasganj.
Construction of MDM Shed and Guard room at composite school Utarna block Sidpura district Kasganj.
FLAME SCANNER COMPLETE RACK ASSEMBLY MODEL BN10 WITH ALL CARDS - ( 4 NO- FLAME PROCESSOR MODULE
Engagement of user fee agency through E-Tender at Aashpur Fee Plaza located at Design Km 231.100 of NH-91 for the use of four and more lane section of Aligarh-Kanpur section from design kilometer 195.733 to kilometer 240.897 of NH 91 in Uttar Pradesh
" DOUBLE BULB SEAL SET OF HOT AIR GATE INCLUDING ONE SET OF FASTENERS AND HOLDING STRIPS (1 SET= 1 N
NIRMAN WORK
NIRMAN WORK
M/s L&T make VCB Breaker
ROAD NALI
NIRMAN WORK
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3) (PACOnly)
Dosing pump (Q3) (3 (3 ))
NIRMAN WORK
Tanker on Agricultural Trailer (Q2) (3 (3 ))
NIRMAN WORK
NIRMAN WORK
Tanker on Agricultural Trailer (Q2) (3 (3 ))
Repairing / Shifting of Trolly of DG set and Shifting / Repairing of DG Sets and associated works in OA Aligarh.
Water Drilling Service
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) (3 (3 ))
Star Delta Motor Starter for Three Phase Induction Motors (V2) (Q3) (3 (3 ))
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) (3 (3 ))
NIRMAN WORK
NIRMAN WORK
NIRMAN WORK
NIRMAN WORK
NIRMAN WORK
Handpump Sub-Assemblies (Deepwell Hand Pumps
Shim for elastic ring for 3 Phase loco, Size OD: 158 mm, ID: 92 mm, Thickness: 2 mm, 06 numbers holes of dia. 14 mm with PCD: 130 mm and 60 degree angle center distance hole, Material IS: 2062, Zinc p
SHIM FOR SPEED SENSOR GAP ADJUSTMENT (Quantity-0.3 mm=1500 Nos. & 0.5 mm=1000 Nos. Total =2500 Nos.) Material SS 304 as per RCF Drg. No. YF02141
High Mast Lighting Octagonal Towerfor Smallareawith LED Flood Lighting System (V2) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS