Loading…
Loading…
43 live24 closing this weekmost from Tribal Affairs Department-MP and Madhya Pradesh Rural Road Development Authority
43 results • Latest
consultants for Supervision and Quality Control Consultancy of Bridge works being constructed under PMGSY-IV (2026-2027) and other Schemes
Construction of Police Chowki, Aamkhut, Distt. Alirajpur
HOSTEL PROCURMENT ITEM
On Turnkey Basis Construction of Temla Barrage, as per detailed scope of work but not limited to that
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 20 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
WHITE WASHING, COLOUR WASHING, DISTEMPERING AND PAINTING OF GOVT. RESIDANTIAL BUILDING UNDER P.W.D. SUB DIVISION ALIRAJPUR DIVISION ALIRAJPUR.
WHITE WASHING, COLOUR WASHING, DISTEMPERING AND PAINTING OF GOVT. RESIDENTIAL BUILDING UNDER P.W.D. SUB DIVISION JOBAT DIVISION ALIRAJPUR.
Regarding the purchase of firecrackers to be filled inside the effigy of Ravana and fireworks for public entertainment on the occasion of Dussehra festival on dated 20.10.2026.
FOGGING_ MACHINE, V MOUNT. FOGGING MACHINE
REPAIR AND MAINTENANCE WORK OF NRC BUILDING AT CHC SONDWA AND CHC JOBAT DISTRICT ALIRAJPUR (M.P.)
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
CONSTRUCTION OF 8 NOS. H- TYPE RESIDANTIAL QUARTERS AT SUB JAIL JOBAT DIST. ALIRAJPUR (M.P.)
CONSTRUCTION OF JUNIORE 50 SEATER BOYS HOSTEL BUILDING AT JOBAT DIST. ALIRAJPUR (M.P.)
CONSTRUCTION OF 50 SEATER NAVEEN POST MATRIC (SC) GIRLS HOSTEL AT JOBAT DIST. ALIRAJPUR (M.P.)
CONSTRUCTION OF 50 SEATER NAVEEN POST MATRIC (SC) BOYS HOSTEL AT ALIRAJPUR DIST. ALIRAJPUR (M.P.)
CONSTRUCTION OF JUNIOUR 50 SEATER GIRLS HOSTEL BUILDING AT JOBAT DIST. ALIRAJPUR M.P.
Construction of Gram Bokdiya To Gujrat Border Road Length 05.80Km. i/c Electric Pole Shifting Work.
Providing and Fixing of material for Repair work, Oil filteration and Oil Top-Up of 2 Nos. 315 KVA transformer at Jobat Project, Nanpur Distt-Alirajpur (M.P.)
Repairing and servicing work of 200 KVA Cummins Diesel Generator Set at Control Room Jobat Project Nanpur Distt- Alirajpur (M.P.)
CONSTRUCTION OF SDO QUATER AT RANGE Bhabra
Government Boys Ashram, Khatali new building construction including electrification
Government Boys Ashram, Undari new building construction including electrification
Government Girls Ashram, Badisardi new building construction including electrification
Government Boys Ashram (English Medium), Chandra Shekhar Azad Nagar new building construction including electrification
Government Van Girls Ashram School, Udaigarh new building construction including electrification
Government Senior Girls Excellence Hostel, Katthiwara new building construction including electrification
Government Boys Ashram, Lilumri new building construction including electrification
Government Girls Ashram School, Badi Juwari new building construction including electrification
Government Junior Boys Hostel, Andharkanch new building construction including electrification
Government Girls Ashram, Phulmal new building construction including electrification
Government Senior Boys Excellence Hostel, Udaigarh new building construction including electrification
FOOD
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
namo harit nagar yojna at ward no. 01 housing board colony at Alirajpur
Supplying and Installation of 3-phase 37 KW (50 HP) Submersible Sewage pump set for sump No. 7 in Dewatering Gallery at Jobat Project Distt-Alirajpur(M.P.)
Supply of 06 Nos EV Garbage collection Vehicle of Capacity 3.5 Cubic meter mounted on Chassis with RTO Registration at RTO Alirajpur, One year Insurance of Vehicles and Transportation Charges included and Charging Unit Installation (Normal charging)
Construction of Alirajpur Bypass (2-Lane with Paved Shoulder) from Ch. 0.000 to Ch. 11.792 in the State of Madhya Pradesh (Total Length-11.792 Kms) under EPC Mode.