Loading…
Loading…
3,158 results • Latest
RADIATOR ASSY, CYLINDER HEAD GASKET, ASSY CLUTCH DISC PRESSURE PLATE, POLE SCREW, SOLENOID SWITCH
SSD 512 GB, RAM 16 GB DDR4, GRAPHICS CARD, MOTHER BOARD, BTY 12V 7AH
TIME DELAY RELAY ANALOG TIMER 22.5 MM DIN RAIL OPERATING VOLTAGE 24 VOLT AC TO 440 VOLT AC, 12 VOLT DC TO 220 VOLT DC, CONTACT-5A, TIME DELAY 0.5 SEC. TO 6.0 HOURS . MAKE -: SELEC, TECHNO, EAPL, L&T,
HOSE, BEARING BALL, ASSY CLUTCH PRESSURE PLATE, SPINDLE WHEEL BEARING, INDICATOR CAVITATION, HOSE HEATER UNITS TO INLET PIPE, ASSY TAIL LIGHT FOUR CHAMBER RH, ASSY TAIL LIGHT FOUR CHAMBER LH, FLAP SET REAR, OIL SEAL FOR CRANK SHAFT REAR
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat GUWADA BHOPALA
CC SADAK MAY NALI NIRMAN KARYE ROSHAN KE MAKAN SE DURGA MATA MANDIR KI OR ROOPUKABAS GUWADA BHOPALA
CC CHOCK NIRMAN KARYE SAMSHAN GHAT ROOPUKABAS GUWADA BHOPALA
nagar palika mahwa jone n 04 me safai karya
Construction of SHC Building at Khanpur Kala Distt. Alwar
OTHER CONSTRUCTION WORK GP KITHOOR
NALA NIRMAN KARYE RAMKARAN KE MAKAN SE SHIV MANDIR KI OR KALAPARA
PIPE LINE DALNE KA KARYE JODHPURA
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat MEJOD
Repair work at Manbhavan Park and the park opposite 2/510 in Ward No. 31.
Construction of a drain in Ganpati Vihar, Ward No. 61, spanning the stretch from Mukesh Yadav place to Jhamman Lal and from Ravindra Singh to Dinash
Necessary repair work at the Upper Primary School, Akhaipura, Ward No. 21
Work regarding the installation of a boundary wall and gate at the Cand D collection center in Ambedkar Nagar
Construction of New District Drugware House (DDW) at Khairthal, Distt. Khairthal-Tijara (Including Internal Electrical Work) (NHM PP 2025-26)
Preparation of Land Schedule for Land use compensation for Construction work of LILO of both circuits of 220 KV D/C Neemrana (400 KV GSS PGCIL)-Behror at 220 KV GSS Ghiloth
MATERIAL SUPPLY TENDER FOR NAREGA AND OTHER SCHEME WORK GP KANETI 2026-27
MATERIAL SUPPLY TENDER FOR NAREGA NAD OTHER SCHEME WORK GP BHOODA 2026-27
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat KYARA
Work of Operation and Maintenance of sub.Div. Laxmangarh JJM Schemes under Division KATHUMAR NIT NO. 01/2026-27
MATERIAL SUPPLY TENDER FOR NAREGA NAD OTHER SCHEME WORK GP PRAGPURA 2026-27
MNREGA EVM ANYA YOJANANTRAGAT SVIKRAT KARYO HETU NIRMAN SAMAGRI SUPPLY IN GP SHAHJAHANPUR
cc sadak nirman karya karn ke ghar se ramnivas ke ghar ki aur gram rambas jhopdi
cc sadak nirman karya samudayik bhawan se vijay ke ghar ke aur gram rambas jhopdi
MNREGA EVM ANYA YOJANANTRAGAT SVIKRAT KARYO HETU NIRMAN SAMAGRI SUPPLY IN GP SIRYANI
cc sadak nirman karya mukhya sadak se samudayik bhawan ki aur
MNREGA EVM ANYA YOJANANTRAGAT SVIKRAT KARYO HETU NIRMAN SAMAGRI SUPPLY IN GP JONAYCHAKHURD
MNREGA EVM ANYA YOJANANTRAGAT SVIKRAT KARYO HETU NIRMAN SAMAGRI SUPPLY IN GP KUTINA
Naksh Chrome Vanadium Steel Allen Key, Warranty 12 month Brand: Naksh (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687790313464 dt.07/07/2026)
METERIAL SUPPLY WORKS GP CHIKANI
Provision of recovery crane services for illegally parked vehicles within the Municipal Council area.
TAIL LAMP ASSY WITH BULB, HEAD LAMP UNIT WITH BULB, BULB TAIL LAMP 12V 21 5W, BULB 12V 10 W, BEARING TAPERED ROLLER
COVER ASSY CYLINDER HEAD, WATER PUMP ASSY, ASSY REAR VIEW MIRROR OUT SIDE, REPAIR KIT FOR SPRING BRAKE CHAMBER, NUT PLAIN HEXAGONAL, BRAKE SHOE ASSY, BRAKE SHOE ASSY FRONT WHEEL, GASKET KIT OIL PAN
MOTOR ASSY STARTING, WHEEL BOLT M 22X 2 5, CROSS ASSY, TAPER ROLLER BEARING REAR OUTER HUB, COVER CYLINDER HEAD
Single phase boring maintenance and installation of new material in boring (annual rate contract)
NALA NIRMAN KARYE MUKESH SHARMA KE KHET SE SAMSHAN GHAT KI OR DUHAR CHOUGAN
CC SADAK NIRMAN KARYE MUKYE SADAK SE CHETRAM GURJAR KE MAKAN KI OR DUHAR CHOUGAN
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat DUHAR CHOUGAN
interlocking tailes kharnja nirman karya vijay ke ghar se subash ke ghar ke aur
Removal of overburden from Road ROW at REIZ MIA Alwar
Construction of control room building, boundary wall, approach road, yard levelling, gravelling and water supply arrangement at 33 KV S/S Karoda (Behror)