Loading…
Loading…
3,158 results • Latest
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) (3 (3 ))
Nrega Construction Material Supply for Financial Year 2026-27 Gram Panchyat Cheend
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat SALETA
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat BAMANWAS CHOUGAN
External Electrification and Street Light Work of Commercial pocket H at Aravali Vihar Scheme phase-II, RHB Bhiwadi
External Electrification and Street Light Work of Commercial plot A sector 4 and 7 at RHB Bhiwadi
FUEL PIPE FILTER PUMP, ELEMENT AIR FILTER, ELEMENT LUB OIL FILTER, PIPE FUEL WIRE BRAIDED TANK, PIPE FUEL INJECTION, OIL FILTER ELEMENT, FUEL FILTER
U J KIT ASSY, RUBBER HOSE ENGINE TO RADIATOR, BRUSH GEAR ASSY, LATCH ASSY DOOR LH, SPARK PLUG CHAMPION, FUSE 15 AMP, HOSE ASSY NON METALIC, FUSE 30 AMP, AIR FILTER ELEMENT, MINI REALAY, RELAY 40A
GASKIT, PISTON STD, RING SET PISTON STD, BEARING CONNECTING ROD, JOINT ASSY UNIVERSAL, OIL SEAL, ASSY TIE ROD, ASSY HOSE, MASTER CYLINDER BI, HOSE ASSY NON METALIC, FRONT WINDSCREEN WEATHER STRIP MOULD, HAND BREAK CABLE
As Per NIT
REAR CHAIN, HOSE ASY NON METALIC, SLAVE CYLINDER, FORK END, CLUTCH ASSY, COVER ASSY CLUTCH, CABLE ASSY CLUTCH, HINGE DOOR UPPER RH, FILTER ASSY FUEL, COIL ASSY IGNITION, BRG CLUTCH RELEASE, WINDING FIELD MAIN
Strengthening and recarpeting of road, Const. of CC road, P and L of interlocking tiles, Construction of RCC drain with approach culvert and Upgradation of Median at Ind. Area MIA Alwar
Procurement of Fire tender vehicle at Agro food park Alwar
BREAK SHOE ASSY, BREAK SHOE ASSY FRONT WHEEL, ASSY COMBINATION SWITCH, CABLE COMP SPEEDOMETER, CLUTCH BOOSTER REPAIR KIT, CHANNEL LIFT VEHICLE WINDOW GLASS, SPRING LEAF, BUSHING CON ROD, HOSE ASSY NON METALIC
HAND BREAK CABLE, WIPER BLADE FRONT, STEERING TIE LH RH, BONET SHOCKER, TIE ROD END, YOKE, ROLLER CAGE DOUBLE ROW, WIPER BLADE, V BELT, CHAIN SPROCKET KIT, HORN COMP HIGH, RELAY MAIN AND FUEL
Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 2000 km x 320 hours; Local
RED CHILLI POWDER, MUSTARD, TURMERIC POWDER, TAMARIND, BLACK PEPPER, CLOVE, CORIANDER POWDER, CARDAMOM, CUMIN SEED
RED CHILLI POWDER, MUSTARD, TURMERIC POWDER, TAMARIND, BLACK PEPPER, CLOVE, CORIANDER POWDER, CARDAMOM, CUMIN SEED
JFC 50 Pair, JFC 20 Pair, JFC 10 Pair, Jointing Kit 50 Pair, Jointing Kit 20 Pair, Jointing Kit 10 Pair, 100 Pair Pillar with Krone Module, 50 Pair Pillar with Krone Module, 20 Pair DP with Krone Module, 10 Pair DP with Krone Module, RCC Route Marker, GI Pipe 4 Inch Diameter, GI Pipe 2 Inch Diameter, MER, IAD, OLE, OFC Patch Cord, Optimux, FXO and FXS, SMPS, Inverter, Battery 12 V 150 AHC, Console PCs, SIP Video Phone, SIP Audio Phone, Digging and Laying
Construction of CC road in Part-B, Transport Nagar, Alwar.
Construction of CC Road and drain work from shyam data to Motilal house ward no. 22
Construction of CC road from devanand Asrani to Rajendra prajapat house ward no. 29
Construction of CC road and drain work from Hariram mothuka to dulli kabaddi and raju asija to gouirav gyanani and raju muskan to bularam somini ward no. 29
New Boring Work At Company Garden Alwar
Construction of channel from Bhurasiddh to Lal Diggi and development work in Lal Diggi
MATERIAL SUPPLY IN G.P. ARRUWA
MATERIAL SUPPLY IN G.P. TIGARIYA
MATERIAL SUPPLY IN G.P. MAITHNA
MATERIAL SUPPLY IN G.P. BERKA
MATERIAL SUPPLY IN G.P. BASETH
MATERIAL SUPPLY IN G.P. SAMUCHI
RADIATOR ASSY, CATCH ASSY HOOD, ALTERNATOR 24 VOLT, ASSY CLUTCH DISC PRESSURE PLATE, HUB BOLT FRONT
ASSY CLUTCH DISC PRESSURE PLATE, ASSY CLUTCH RELEASE BEARING WITH SLEAVE, ASSY UNIVERSAL JOINT, CHAIN AND SPROCKET KIT, BREAK SHOE ASSY
CLUTCH ASSY 260 DIA, CLUTCH RELEASE BRG, PILOT BRG, GEAR LEVER KIT, ASSY CLUTCH DISC PRESSURE PLATE, SPG BRAKE CHAMBER REPAIR KIT MSP5, STARTER MOTOR MICO, PUMP HYDRAULIC RAM HAND DRIVEN, SPRING ASSY FRONT
CC/ INTERLOCKING SADAK NIRMAN KARYA PAKKE ROAD SE SHAMSHAN KI OR PALWA GP-PALWA (As per G-Schedule)
MATERIAL SUPPLY IN G.P. JADLA
CLUTCH ASSY, BUSH, MOUNTING RH FRONT LH, CABLE COMP SPEEDOMETER, CAP COMP FUEL FILLER, CAM CHAIN KIT, HOSE, FRONT HUB BEARING, OIL SEAL, BREAK SHOE ASSY FRONT WHEEL
Necessary Repair work in Damages Roads during Mansoon Under PWD Sub Dn Alwar
Necessary Repair work in Damages Roads during Mansoon Under PWD Sub Dn Malakhera
Necessary Repair work in Damages Roads during Mansoon Under PWD Sub Dn Umren
Supply of Construction Material RDPR Scheme G-RAM JI, SFC , FFC and other scheme for Financial Year 2026-27 in Gram Panchyat PADAK CHAPALI
NALA NIRMAN KARYE APURN NALA SE BHARU JI KE ISTHAN KI OR NARHET
NALA NIRMAN KARYE KAJOD KE GHAR KE PASS RAIGAR MOHALLA KI OR NARHET