Loading…
Loading…
475 results • Latest
Construction of Four Lane of GT Road to Babain in village Kaulapur , Bargat Chowk to Sunariyan Chowk , Babain in Distt. Kurukshetra (Cm Announcement Code no. 26013 dated 06.04.2022 ) (Estimate No. OPZ - 210 /2025-2026) (Pdg. Line Shifting Work).
Additional 100 bedded Hospital Block Phase - II in the Campus of LNJP Hospital at Kurukshetra ( Pdg. 4Nos. 20 Passengers and 2Nos. 13 Passengers Lift ).
Upgradation of Civil Hospital from 200 Bedded to 300 Bedded at Ambala City in Ambala Distt. (Pdg. Additional E.I and Electrical Connectivity).
Drilling of tubewell 400 mtr depth with pumping machinery construction of pump chamber size 10 by 12 laying of 150 mm id Rising main 70 mtr construction of CC path, provision of Electric connection
Cleanliness in PY Mullana, SY Saha, SY Kesri and PC Talheri Gujran, drains inside, all Sulabh Shauchalya and Urinals in all four mandis under Market Committee Mullana.
Construction Fabrication of Milk Booths as per our drawing design
Const of brick paved rasta from Jarot road to Nirmal, from KakkaAcchar to JarnailNarmail, from main rasta to Daya, from main rasta to Laddi, from main rasta to Avtar Namberdar to Lakhmeer, from Kasoul road to Lakhmeer in village Panjokha Sahib
HGVY Const. of Brick Paved way from Vill. Barsu Majra to Vill. Nanhera at Village Barsu Majra Block Naraingarh
HGVY Const. of Brick Paved way from Village Balti to Village Bhal Majra at Village Balti Block Naraingarh
HGVY Const. of Brick Paved way from Vill. Sain Majra to Vill. Panjlasa at Village Sain Majra Block Naraingarh