Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,062 results • Latest
Construction work of Inhauna to Barabanki Border tak Link road
Special Repair of Jagdihspur Bazarshukul road to Pratappur Sevra Link Road
Special Repair of Tatarpur Link Road
Special Repair of Sitauli Gram ke majare pure Rokha Link Road
Ward No 09 me Rajesh Verma ke complex se Sarwanpur Talab Tak CC Nali NIrman Karya
Special Repair of Goyan Sinduriya to Rampur khas Link Road
Special Repair of Rastamau to Foola Link Road
Special Repair of Kusumbhi Link Road
Special Repair of Goyan Sinduriya Link Road
Special Repair of Semrauta Shivratanganj road to Jagatpur Link Road
Special Repair of Jehta Usraha Link Road
Special Repair of Rastamau kainal patri Link Road
Special Repair of Pakargaon Link Road
Special Repair of Taramau Barara Link Road
Special Repair of Materwa Chauraha to Ramai tak Link Road
Special Repair of Ariyawan Link Road
Construction work of the connecting road from Pure Mohammad Nawaz Pitch Road to Manjharia Mod via Pure Chauhan Ancient Hanuman Temple
NAGAR PANCHAYAT MUSAPHIRKHANA MRF CENTER PER SWACHH BHARAT MISHAN NAGRIYA 2.0 YOJANA KE ANTRAGART WET WASTE PORCESSING PLANT UNIT KE ADHISTHAN KA KARYA.
Repair work on a dilapidated minor bridge situated over a drain at km 3 (200) of the Rampur Panwara link road, via Kanpurian, from Ganganaga
Repair work on the dilapidated minor bridge situated over a drain at km 3 of the Rampur Panwara link road (via Kanpurian) from Ganganagar
Repair work on the dilapidated minor bridge situated over a drain at km 3(900) of the Jaitpur-Sakatpur link road
Repair work on the canal culvert at km 8 of the Singhpur-Tiloi road (ODR)
Repair work on the canal culvert at km 10 of the Singhpur-Tiloi road (ODR)
Repair work on the dilapidated minor bridge situated over a drain at km 3(400) of the Jagatpur-Mathagaon link road
Repair work on a bridge on the Khanpur Chapra link road in Amethi district
Special Repair of Nawaj Madargarh Link Road
Construction of drains on both sides of the road for the urban stretch of National Highway No-56, from chainage 3.400 to 5.275 at Jagdishpur
Special Repair of Dichauli Link Road
Special Repair of Sitauli gram ke Majare Sitauli Link Road
Special Repair of Aashishpur Link Road via Fattepur Link Road
Special Repair of Hargaon Suratgarh pure Chhatta Link Road
Special Repair of Hajaribag Kotwa Link Road
Special Repair of Pure Bhawa Link Road (Revenue Village of Nigohan) Link Road
Special Repair of Mohammad Shah house to the Masjid in Gram Sabha Ashapur Ruru
Special repair of Badgaon Punnpur Shitalaganj Link road
Construction of a CC road and a drainage channel in the inhabited area opposite the Amethi Police Lines at km 1(250) of the Amethi Kakwa road ODR
Special repair of Amethi Dhammaur road to Ranveer Inter College
Construction of link road from Shukulpur bridge to Khurdahiya Tikaria
Construction work of the link road from Tanda Bada road km 85 to Naya Ka Purwa of revenue village Saruwawan
Construction of Kheda link Road shesh Bhag including 5 year Maintenance
Patch Repair Work of Village Roads in Block Sangrampur Under AE-4rth
PROPOSED CONSTRUCTION OF B PACS LTD 100 MT CAPACITY GODOWN AT ANNIVAIJAL BLOCK GAURIGANJ, DISTRICT AMETHI.
Under the Twarit Aarthik Vikash Yojna Construction work and 5-year maintenance work from Singhpur Rajwaha to Hindu Ka Purwa link road via Pandura
Under the State Road Fund Scheme Construction work and 5-year maintenance work of the link road from Inhauna Maharajganj road Ratwalia to Sarvjeet Bazar road via Dandupur
Construction of Mishrauli to Pure Baba link road
Construction of a 1x5-meter span box culvert to replace a damaged culvert at km 1 and 2 of the connecting road located near Gulal ka Purwa Sagra on the Shahgarh Hardoiya road extending up to Saraiya
SILT CLEARANCE OF SARUWAWAN MINOR FROM KM 0.000 TO KM 6.000 AND SCRAPING KM. 6.000 TO KM. 7.724
SILT CLEARANCE OF UJJAINI MINOR FROM KM 0.000 TO KM 6.700 AND SCRAPING KM. 6.700 TO KM. 7.408
Repair work on the connecting road from Nara Adhanpur to Maheshpur including the construction of a 1x3 meter span box culvert at km 1
SILT CLEARANCE OF HARDOIA DY FROM KM 0.00 TO KM 10.000 AND SCRAPING KM. 10.000 TO KM. 10.901