Loading…
Loading…
97 results • Latest
Construction of RCC Culvert and both side RCC Drain at Atrasi Road near Galaxy Garden by pass road.
Making Bandh to stop water flow by earth firled bags and removel as it after cleaning the Nallow all complete.work
Construction of CC Road and drain in Mohalla Raj nagar Colony from Main Road to Monu Sagar, Hariom, Rakesh Lane.
Earth work in filling or in embankment in ordinary soil, eccavation to be in the from of regular pits not exceeding 1/2 meter(20") depth and earth work in embankment to be in 20 cm. (8") layers including eamming and dressing the surface to required levels and slopes and also including 1.50 M(5ft.) and 5 Km lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 5 km distance as directed by the Engineer-in charge. (S.I No. 253 Ch-4) But excluding G.S.T
Construction of CC Road and Drain in Mohalla Laxman wali Mandhayya from Indrapal house to Chunni wali Mandhaya Road and Side lanes.
Earth work in filling or in embankment in ordinary soil, eccavation to be in the from of regular pits not exceeding 1/2 meter(20") depth and earth work in embankment to be in 20 cm. (8") layers including eamming and dressing the surface to required levels and slopes and also including 1.50 M(5ft.) and 5 Km lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 5 km distance as directed by the Engineer-in charge. (S.I No. 253 Ch-4) But excluding G.S.T
Construction of RCC Drain in Mohalla Aibjabad from main Road towards Band.
Making Bandh to stop water flow by earth firled bags and removel as it after cleaning the Nallow all complete.work
Construction of RCC Drain at Joya road from Ashiyana Colony to Drain constructed by PWD.
Making Bandh to stop water flow by earth firled bags and removel as it after cleaning the Nallow all complete.work
Construction of CC Road and drain in Razzaqpur from Primary School to Sattar, Rajveer house, 2. From Kapil, Harparl house near Chamunda Temple to Furqan house.
Earth work in filling or in embankment in ordinary soil, eccavation to be in the from of regular pits not exceeding 1/2 meter(20") depth and earth work in embankment to be in 20 cm. (8") layers including eamming and dressing the surface to required levels and slopes and also including 1.50 M(5ft.) and 5 Km lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 5 km distance as directed by the Engineer-in charge. (S.I No. 253 Ch-4) But excluding G.S.T