Loading…
Loading…
6,552 results • Latest
Checking of leakages and restoration of sloughned embankments by way of Construction of Retaning/Lining Wall of Wohan Canal Right at RD 11300M
Desilting of Ganie Khul Mir Danter Canal from RD 0-2500 mtrs at spots
Restoration of offtake points of Sayen Ladi Wangam Irrigation ladi.
Restoration of offtake points of chek ladi and breach on Zen Zen ladi near RD. 5490 mtrs.
Repairs to Gham khul at Hardpora by way of construction of lining wall, jacketing and Coping.
Repairs of supply channel/Escape channel of Thajiwara Canal at Headworks by way of Construction of lining wall.
Restoration of breach by way of lining wall on Voi-Waterhal ladi at Rd 400 mtrs.
Construction of lining wall on both sides of Bragam ladi Downstream of flume.
Repair to Magraypora Bifurcation of D3 branch of Martand canal.
Construction of lining wall with bed treatment and PCC jacketing on both sides of Sether minor at spots.
Restoration of breached spot at RD 2700 m on Pethan Zamindari Khul.
Repairs to supply Channel and restoration of breaches of GKMD by way of construction of lining wall at RD, 850, RD 1450 andRD 2550, crate work at offtake point and near RD 1150 and jacketing near supply channel.
Checking of overflow of Bringi Canal old by way of Construction of lining wall at RD 600, RD 1050, RD 2300, RD 2400 and RD 3100.
Strengthening of weak embankment and checking of leakages of Awantipora canal near RD 1300 mtrs.
Checking of overflow by way of construction of lining wall on Manzigam Singpora ladh offtaking from Martand canal at RD 700 mtrs.
Desilting of Zall Khul from Downstream Khan Mohalla Bridge Khan Mohalla to its Tail end at Seer Hamdam.
FACE LIFTING OF THE INSPECTION BUNGALOW AT PAHALGAM, CONSTRUCTION OF ADDITIONAL ACCOMODATION, INCLUDING WASHROOM
Repair Renovation Of Residential Quarter Of Chief Execative Officer PDA At Pahalgam
Construction of Link Road from Masjid Sharief Rawakhpora to Peerbal upto Wudur at Chatrassoo Budroo.
Restoration of Damaged CLF and protection Wall along Poshwan Mohallah near Stadium Pahalgam.
Construction of tile Path/lane from house of Mohd Shaban Bhat to Gh Qadir Najar.
Dev. Of Vending zones near Gulshan Park W.No 02 Mc Aishmuqam MDC
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2), Pneumatic Tyres For Passenger Car Vehicles - Diagonal And Radial Ply Marked to IS 15633 (Q2), Tubes for Pneumatic Tyres ISI Marked to IS 13098 (Q2) (3 (3 ))
Repair and Renovation of Range Office Kakapora under CAMPA NPV for the financial year 2026-27
Upgradation of Manzmoh Bokadpathi road.
C/O FOOTHPATH/X-ING NEAR NIK AALAM W.NO 2 BLOCK VERINAG
C/O FENCING NEAR GRAVEYARD AT W.NO.1 BLOCK VERINAG
C/O P-WALL NHO ABDUL RASHID CHAD AND ORS BLOCK VERINAG
C/O FENCING NEAR GRAVEYARD AT GADAN W.NO. 1 BLOCK VERINAG
Construction/Up-gradation of road from Badragund Sheikhpora via Shakti Water Rservoir at Tenngdar Parraypora along the Yean.
Construction of Slab Trash Guard over Existing Drain from the H/O Mohd Ibrahim to H/O Mohd Akber Mir at New Colony Hazratbal Anantnag.
Upgradation of road from Vessu Bridge to Nipora
Desilting of Canal at Moominabad Anantnag
Construction of road from Astanbal to Darnoo upto Banjar Along side of Eatoopora ladh at Vessu.
Construction of Tiled lane and Drain From Riyaz ahmad Kadoo to Muzaffar Ahmad Khruda at Gousia Colony Achabal Adda Anantnag
C/O FENCING NEAR GRAVEYARD AT NAGI NAD W.NO 3 BLOCK VERINAG
Integrated Development, Upgradation, Rehabilitation Maintenance of Ward Infrastructure, covering works of various nature comprising Lanes, Drains, Roads, Culverts, Protection Works, Fencing of graveyards/ Public Assets and Civic Amenities, among othe
.Construction of Najar Mohalla Badragund road
C/O BATHROOM AT KHANDAY MOHALLA TAKIA MAGAM NHO MOHD ALTAF KHANDAY S/O HABIBULLAH KHANDAY BLOCK BRENG
Holistic Upgradation, Development, Rehabilitation and Sustenance of Ward Infrastructure, entailing works of multifarious nature including Lanes, Drains, Roads, Culverts, Protection Works, Fencing of Graveyards/Public Assets and Civic Amenities under
Stage Contract for Supply of Key materials required for maintenance of 33/11KV receiving stations along with their Lines under the jurisdiction of STD Bijbehara during the year 2026-27, Part II
CROSSING AT MIDDLE SCHOOL NHO KHAK HAJI, FARID BIMLA AT SONBARIE- A BLOCK BRENG
C/O WATER RESERVOIR NLO ROUF AHMAD DANGROO, HILAL AHMAD DANGROO, MOHSIN NABI DANGROO AND OTHERS AT WANDEVALGAM A (2) SOYAN BLOCK BRENG
PIPE BRAKE NO 3
REPAIR/REPLACEMENT/RENEWAL TO CERTAIN WOODEN AND STEEL FURNITURE AT KHUNDRU, KHANABAL, AWANTIPUR, KHUNMOH, KHREUH AND SHER-E-SHALI UNDER GE 861 EWS
Supply, testing and Commissioning of Imported Rough cutter for Lidder Valley Golf Course, Pahalgam.
Construction of Hajam Mohallah Liver Link Road by Way of P/L RBM and Grade-II
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Construction of Dug Well for WSS Bal Brakpora under JJM (Re Apprisal)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))