Loading…
Loading…
6,536 results • Latest
Restoration of embankments of Sonman Nallah by way of crate work near Govt. Girls Higher Secondary School Yaripora RD 14100 mtrs.
Supply, Installation, Testing and Commissioning of 625 kVA Diesel Generator Set with Allied Electrical Works for 2x1000 LPM PSA Medical Oxygen Generation Plant at MMABM Associated Hospital, GMC Anantnag.
Maintenance, Repairs and execution of other emergent works of Furrah Section Hyd. Sub Division Mirbazar (Phase 2nd) Furrah Bumthan, Malpora Magalpora Brawrie, Hanjipora ,Ganoora and Furrah Zadoora .
Construction of Flood protection work by way of toe crates near RD 31600 at Kilam Gund
100 No. of RCC spun Pipes (18inch) at different spots in AC Pulwama.
Maintenance, Repairs and execution of other emergent works of Wanpoh Section Hyd. Sub Division Mirbazar (Phase 2nd) Palpora Lassispora, Bumthan Lalipora, Chirhama Bongam ,K.G Raina and Gasipora .
FP Bund at left side of Sandran River from Yarbal to foot bridge at Herpora Muniwar Anantnag RD km 43 300 mtrs
Hakhran Nallah-Const. Of FP Work on R/S at village Ard poolia U/S Foot Bridge RD 5520 m
Maintenance, Repairs and execution of other emergent works of Nipora Section Hyd. Sub Division Mirbazar (Phase 2nd) Rajard Donwani, Sadoora , Lalan Ganoor, Kachpora Bagatpora and NC Sadoora .
Upgradation of road from Methi Mor to Ganga Naran
Upgradation of Road from Hangalgund to Puroo road
Veshow Nallah-Const. of F.P work U/S of Nihama Bridge left side of at RD 10400 Mtrs
Construction of FP Work at Gujar Basti to Bradhaji bridge on L/S at spots RD km 3 300 MTRS
Construction of Flood Protection work on Chaka nadi by way Const of Cement Concrete wall at Masjid Sharief
Upgradation of Chaklipora Thimran road by way of Protection work
Bringi Nallah-Anti Erosion work on at Village Chicherpora RD 26500 mtrs
Construction of Tile path/lane from house of Gh Nabi Mir to House of Nazir ahmad Rather at Rangward
Upgradation of interior roads of Tailwani
Construction of Str. ACR at Govt. Middle School Nadoora Anantnag B.W.O Electric work
Upgradation of Bulbul Nowgam Wanihama Road
Restoration of Ziyarat Sharief at Satreshi Akingam Achabal
Aripath Nallah-River Training / F.P work on at Chaklipora RD 0 300 mtrs
Ardwani Nallah-Construction of flood protection and anti erosion work on R/S Km 18 400 mtrs to Km 18 800 Mtrs at Wagay Mohalla Waghama
Upgradation of road from Pahalwandar to Oakland School Devipora
Lidder Nallah-Flood protection work of critical spots on D/S Guree bridge to Confluence RD Km 2.3 to Km 2 300 to Km 2 600 mtrs
Development of lane from house of Habibullah Ganie to Darasgah at Pahalgam Village
Ardwani Nallah-Construction of Flood Protection Work at Poshkreeri by way of crates km 9 , km 10 500 at spots
Crash Barrier, Informatory Sign board, Cat eye, Gantry board
Ardwani Nallah-Construcion of Flood Protecion Work at Chandipora and anti erosion, flood protection work on Right and left side at kanelwan D S bridge by way of laying ofcratesRDKM11,km 12 300
Imoh Sundoo Nallah-Flood Protection Works on Critical Spots KM 2 100m to KM 4 600
Flood protection and river training works from Krad to Tailwani on Aripath RD 4500 Mtrs
Veshow Nallah Construction of F.P.work on left side at Panipoora at RD.21300 Mtrs
High End Laptop - Notebook (Q2)
Sandran Nallah Construction of Flood Protection work by way of Crate Bund with stone pitching on the left side of at village Bonagund RD 18490M
Brengi NallahConstruction of FP work from RD 800 mtrs to RD 8000 Mtrs from Kralwani vailoo to Soaf Bridge at RD 3600 Mtrs RD4800 Mtrs,RD5500 Mtrs and RD7500 Mtrs
Restoration of Rwall near Kolhi Heights Guest House at Aru Pahalgam
Vethvethroo Nallah- Flood Protection work on Left side of by way of Raising Existing crates Bund at village Bemdal changoo RD 4180m
Construction of Boys Middle School Gorigowan Building Less Upper Primary
Strengthening of old building blocks and development of Path at Govt Girls Model HSS Anantnag ( Ranibagh).
Construction of R-Wall at Hardmarg Wopzan at Different spots under AR 2026-27 ( Phase -I)
Construction of Protection wall/ Drain at Donipawa
Renovation of Inspection Bunglow at Pahalgam and its electric system.
Removal of Blockages/desilting of Martand Canal from RD 8120 to RD 8940mtrs.
C/O FLOOD PROTECTION BUND FROM LAND OF GH QADIR BHAT AT ATHWATOO BLOCK K.PORA
TILE PATH FROM AABID WANI TO HOUSE GHULAM RASOOL BHAT AND OTHERS BLOCK VERINAG
Removal of Blockages/desilting of Martand Canal from RD 7300 to RD 8120 mtrs.
Construction of steel Aquaduct on distribution channel of Sirhama LIS
Repairs to leakage spot near RD 3650 mtrs of Dadi Canal
C/O FENCING GRAVEYARD AHKUS BLOCK BRENG
C/O FENCING OF GRAVEYARD PAHLIPORA NLO NAZIR AHMAD AND ORS AT MAGAM A BLOCK BRENG