Loading…
Loading…
3 results • Latest
Construction of Excise Office/Malkhana/ Hazat/ Barrack (Male/Female) and Boundary Wall at Distt. ARWAL Yr.26-27
Comprehensive operation and maintenance and Special repair of Ward level Piped Water Supply Schemes (Non Quality) Block-Kurtha, Panchayat-Pinjrawan, Ward No.-3,11,12, Block-Karpi, Panchayat-Keyal Ward No.- 1,10 Panchayat-Karpi, Ward No.- 1,2,9,10,12,15 Block- Sonbhadra banshi suryapur Panchayat-Sonbhadra, Ward No.- 5,12,14 & Piped Water Supply Schemes Karpi Ward No.- 3,4,6,7,8 Piped water Supply Schemes Sonbhadra Banshi suryapur Ward No.- 2,6,7,8 Piped Water Supply Schemes (Non Quality) Keyal Ward No.- 5,6,7,8,9,15 Piped Water Supply Schemes (Non Quality) Pinjrawan Ward No.- 8,9,10 Total Scheme-18 Total ward No.-32 based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bill for five years.
Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.