Loading…
Loading…
Found 167 active tenders
167 results • Latest
Construction of a culvert in Shivpur, Ballia district
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Construction of a culvert in Diyara Bhagad, Ballia district.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Construction of a culvert in Trikalpur Udaha, Ballia district.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
AKUONI SE RAMGHARH TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.
SHRINAGER SE PRAIMARI PATHASHALA TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.
SENPUR KALA SE TAL TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.