Loading…
Loading…
466 results • Latest
Manpower Outsourcing Services - Fixed Remuneration - Admin; Computer Operator; Graduate, Manpower Outsourcing Services - Fixed Remuneration - Admin; Driver - HMV; High School, Manpower Outsourcing Services - Fixed Remuneration - Others; Peon; 8th, Manpower Outsourcing Services - Fixed Remuneration - Others; Swachhakar; 8th, Manpower Outsourcing Services - Fixed Remuneration - Others; Chaukidar; 8th, Manpower Outsourcing Services - Fixed Remuneration - Others; Mali; 8th, Manpower Outsourcing Services - Fixed Remuneration - Others; Pustakalaya Parichar; 8th
12/EDC(BLP)/2026-27
11/EDC(BLP)/2026-27
10/EDC(BLP)/2026-27
GIS related Survey Services - Hectares; DGPS survey of post harvest management and processing technology college, pachawal at sanawal district Balrampur-Ramanujganj; DGPS survey of post harvest management and processing technology college, pachawal a..
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Rural tourism development work in village Imlia Koder of development block Pachpedwa of district Balrampu
Under District Balrampur, Construction of Road up to North Lakhanipur Road near Shiv Prasad house in Tedhwa, Lot No 1
Under District Balrampur, Construction of Road of Nevada to Idgah link Road from Lokiya Tahir Prime Minister Road, Lot No 27
Under District Balrampur, Construction of Road of Mirzapur link Road from Baksaria on the right side of Pilibhit Basti Road via Imilia, Lot No 7
Under District Balrampur, Construction of Road of the Road from Samda Singahi Marg to Belwa Binhoni via Dubariya, Lot No 25
Under District Balrampur, Construction of Road of link Road from Balua Ghat Bharosganj Pitch Road to Ahirndih via Fattedih Baldevdih, Lot No 9
Facility Management Services - LumpSum Based - district jail balrampur; concertina wire fencing work; Consumables to be provided by service provider (inclusive in contract cost)
Supply of TKR Machine
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; Diploma; Healthcare, Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Others, Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Performance Based Maintenance Contract from Km.310.220 to Km 384.874 of NH-730 Total length.74.654 Km in the State of Uttar Pradesh.
Renuation of Muktidham at Ward No 07 (1st Call)
Construction Work of Atal Smriti Talab at Ward No 13 (1st Call)
Construction Work of Dr. Bheemrao Ambedkar Smriti Talab at Ward No 06 (1st Call)
Zonal Work For 2026-27 Road SOR 15.06.2026 (Every Work upto 5.00 Lakh) 1st Call
Zonal Work For 2026-27 Building SOR 10.06.2026 (Every Work upto 5.00 Lakh) 1st Call
Glucometer Strips (Q2) ( PAC Only ) (3 (3 ))
Hemoglobin Test Strips (Q2) ( PAC Only ) (3 (3 ))
Catering Service per Packet based - Veg; REFRESHMENT PACKET; REFRESHMENT PACKET
Catering Service per Packet based - Veg; REFRESHMENT PACKET; REFRESHMENT PACKET
Construction of an interlocking road from the Kaliji Temple to Sadhu Giri house in Gram Sabha Jhauna
Construction of an interlocking road from the paved road to Bambhole house in Gram Sabha Motipur Semri
Handling and Transport on Lumpsum Basis - Handling Service
PA System for Conference Hall
Monthly Basis Cab & Taxi Hiring Services - SUV; 1200 km x 208 hours; Local 24*7
Patch work of rural roads under construction block PWD Balrampur Development Block Balrampur 2026 27
Lot 1901
Patch repair work of various (VR) routes under development block Pachperwa in the financial year 2026-27 (LOT NO - 4)
Patch repair work of various (SH / MDR / ODR) routes under development block Harraiya Satgharwa in the financial year 2026-27 (LOT NO-06)
Patch repair work of various (SH / MDR / ODR) routes under development block Gainsari in the financial year 2026-27 (LOT NO-07)
Patch repair work of various (VR) routes under development block Tulsipur in the financial year 2026-27 (LOT-01)
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FOR Village- Koti(Imlidand,Khaspara,Korwapara) Koti(Panditpara) Koti (daridih, Pateratola, Purankoti) BLOCK- Wadrafnagar District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 09 M HEIGHT & 10 KL (5000L X 2NO.)- 00 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m & 63 mm dia 840 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 550 m., 75 mm dia. 1000 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 0 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village-Koti(Imlidand,Khaspara,Korwapara)Koti(Panditpara) Koti(daridih,Pateratola,Purankoti) BLOCK- Wadrafnagar District – Balrampur(C.G.)
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FOR Village- Darridih ( Uraopara, Purvtola ,Khaspara ) BLOCK- Balrampur District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 09 M HEIGHT & 10 KL (5000L X 2NO.)- 00 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m & 63 mm dia 00 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 1300 m., 75 mm dia. 127 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 46 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village- Darridih ( Uraopara, Purvtola ,Khaspara ) BLOCK- Balrampur District – Balrampur(C.G.)
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FORVillage- Mahewa ( Gagrimod, Harijanpara) BLOCK-Wadrafnagar, District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 12 M HEIGHT & 10 KL (5000L X 2NO.)- 02 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m &63 mm dia 330 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 2390 m., 75 mm dia. 00 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 66 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village- Mahewa ( Gagrimod, Harijanpara) BLOCK-Wadrafnagar, District – Balrampur(C.G.)
CONSTRUCTION OF PRAYAS RESIDENTIAL SCHOOL BALRAMPUR DISTRICT BALRAMPUR-RAMANUJGANJ(C.G.)
LIGHT AND SOUND SHOW SYSTEM PIPRAHAWA ANCIENT STUPA KAPILVASTU,DISTT-SIDDHART NAGAR (U.P.)
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Drinking Water Coolers (V4) ISIMarked To IS1475 (Q2)
vegetable
Coating work from behind Dharampur Uttaraula Road Industrial Area to Dharampur Pond
Mukhyamantri Samuhik Vivah Yojana Upahar Kit
Construction of MP hall in JNV at Balrampur (Uttar Pradesh)
Shifting of water supply pipeline during road widening in Tulsipur Nagar Panchayat, Dist- Balrampur
CONSTRCTION OF GODOWN COMPLEX-(GROUP NO. 02) SURAJPUR (UCHADIH) 10800 MT, KUSMI (SHANKARGARH) 1800 MT, RAJPUR 3600 MT & BALRAMPUR (JAWAHARNAGAR) 3600 MT [Total 19800 MT] (1st Call)