Loading…
Loading…
745 results • Latest
Construction of roof treatment work of Pump house and repairing of drain at Kukrakuli Intake site under Saltora- Block Saltora-Chhatna W/S Scheme (BRGF ph - I project),
Laying of Pipeline at Ghoramuli village under Rejuvenation of Sarberia W/S Scheme under Bankura Division, PHE Dte.
Construction of Pucca Drain from Shib Mandir to Bridge More at Papra Mouza JL No 191 under Khatra Block Activity Code 119706079 Fin year 2026-27 Fund 15th FC
Construction of Cencrete Drain from Sarathi Garai to Gunadhar Mahata House at Kurkutia Mouza Bhordanga JL No 198 Plot 106 under Khatra Block Activity Code 119705012 Fin year 2026-27 Fund 15th FC
Custom Bid for Services - Remote Field Eddy Current testing (RFET) of Boiler water wall during overhauling of unit #1, 3&5 or Any three units of MTPS Ph-I Similar Category Operation and Maintenance Power House/Power Plant
Operation and Maintenance Power House/Power Plant - ARC for Online Chemical Treatment of Condenser Cooling Water System of U1to6 MTPS
Emergent restoration work of Kumbhasthal-Hetia-Mirzapur Road from Ch. 8.00 kmp to 11.00 kmp (in stretches) under South Bishnupur Sub Division of Bishnupur Division, PWD
Kotulpur-Indas Road from Ch. 4.00 kmp to 6.00 kmp and 7.00 kmp to 8.00 kmp (in stretches), emergent restoration work under South Bishnupur Sub Division of Bishnupur Division, PWD in the district of Bankura
Bishnupur-Kotulpur Road from Ch. 23.00 kmp to 27.00 kmp, 28.262 km to 28.578 km and 29.414 km to 30.709 km (in stretches), emergent restoration work under South Bishnupur Sub Division of Bishnupur Division, PWD in the district of Bankura
Repairing work with Water Bound Macadam, Potholes with Bituminous Macadam and open graded premix surface from Ch. 0.00 kmp to 2.00 kmp an Ch. 8.00 kmp to 10.00 kmp of Indas-Saspur-Akui Road (in stretches) under Bishnupur Division, PWD during the year