Loading…
Loading…
6,993 results • Latest
Conversion of SHCs into HWCs at Dangarampur SC under Indpur block under CMOH office ,Bankura.
Day to day Operation and Maintenance of distribution system, over head reservoir including Stand posts, FHTC of Saltora - Chhatna water supply scheme (BRGF Ph- I) including operation of sluice valve under Bankura Division, P.H.E. Dte.
Day to day Operation and Maintenance of distribution system, over head reservoir including Stand posts, FHTC of Saltora - Chhatna water supply scheme (BRGF Ph- I) including operation of sluice valve under Bankura Division, P.H.E. Dte.
Conversion of SHCs into HWCs at Hirbandh SC under Hirbandh block under CMOH office ,Bankura.
Necessary field works a calculations, structural evaluation of pavement by cutting pit with photograph, Drone shoot videography throughout the road, conducting traffic census for a continuous period of 7 days, axle load survey for 3 days and submissi
Necessary field works and calculations, structural evaluation of pavement by cutting pit with photograph, conducting traffic census for a continuous period of 7 days, axle load survey for 3 days and submission of DPR (6 copies) in connection with Ind
Repair and Renovation works including fencing work surrounding the Nursing Hostel within Bishnupur DH, Bishnupur HD. RN 24002499, Project ID-HF252646188S000 (2nd call).
Day to day Operation and Maintenance of distribution system, over head reservoir including Stand posts, FHTC of Saltora - Chhatna water supply scheme (BRGF Ph- I) including operation of sluice valve under Bankura Division, P.H.E. Dte.
Necessary repairing and modification of existing lavatories and ablution facilities inside main court buildings of Bishnupur Sub Divisional Court, in the district of Bankura under Bishnupur Division, P.W. Dte during the year 2025-26
Repair and Renovation works of Indoor unit, Patrasayer RH, Bishnupur HD, RN 24002858, Project ID- HF252647514S000.
Repair of OPD Block, Pharmacy Block, BMOH Officer, All Male and Female toilet Block and Construction of Drain and Boundary wall with entrance gate at Ranibandh under Ranibandh Block, Bankura, RN 25001556, Project ID- HF252647574S000
Day to day operation and maintenance of Rest Shed (Situated above the Bankura W/S Circle Office) under Bankura Division, P.H.E.Dte. (wef.- 01.03.2026 to 28.02.2027) (One Year)
Day to day operation and maintenance for the Executive Engineer Office building and office premises under Bankura Division, P.H.E.Dte. (wef.- 01.03.2026 to 28.02.2027) (One Year)
Supply and Delivery of LT DIST KIOSK FOR 25KVA TRNF (SMC/FRP)
Day to day Operation and Maintenance of distribution system, over head reservoir including Stand posts, FHTC of Saltora - Chhatna water supply scheme (BRGF Ph- I) including operation of sluice valve under Bankura Division, P.H.E. Dte.
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC), Street Stand Post of Indpur (Zone- I) W/S Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte. for (One Year) (01.03.2026 to 28.02.2027)
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC), Street Stand Post of Goaldanga water supply Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte. for (One Year) (01.03.2026 to 28.02.2027)
CONSTRUCTION OF WATER TANK AT HATISHAL SCHEME ID APAS/01/256/196/0004 WITHIN UTTARBAR GP
COSNTRUCTION OF STAGE AT GOSWAMI PARA MANDIR SCHEME ID APAS/01/256/196/0001 WITHIN UTTARBAR GP
UPGRADATION OF ROAD FROM ALOKE GHOSH HOUSE TO KALI MANDIR AT KURORIHA BOOTH SCHEME ID APAS/01/256/162/0011 WITHIN MAYNAPUR GP
CONSTRUCITON OF SOSAN SHED AT RAJMA PUKUR PAR SCHEME ID APAS/01/256/56/0011 WITHIN SALDA GP
Operation and Maintenance of Distribution and Rising Main, Pipe line (CI/DI/AC/UPVC), Street Stand Post of Karakdanga W/S Scheme including operation of sluice valve under Bankura Division, P.H.E. Dte. for (One Year) (01.03.2026 to 28.02.2027)
Day to Day Operation and Maintenance of Distribution System and Rising Main Pipe Line (DI/CI/UPVC/HDPE) , Ground Tube Well, RBTW with Collecting Line, Stand Post including FHTC of Water Supply Scheme for Pratappur (Manachar)
Online Dew Point meter, Model: LPDT, Range: - 100degC to+ 20 degC, 2 wire Transmitter, 4- 20mAoutput
INSTALLATION OF SOLAR LIGHT AT HAZRABANDH AREA 2 NOS under Chhandar Gram panchayat fund APAS FY 2025 26
INSTALLATION OF SOLAR LIGHT AT DHENGAKEND VILLAGE 2 NOS under Chhandar Gram panchayat fund APAS FY 2025 26
REPAIRING OF CC ROAD FROM KARTICK GHOSH HOUSE TOWARDS BANERJEE PARA JL No 151 UNDER CHHANDAR GRAM PANCHAYAT FY 2025 26 APAS FUND
Installation of New Rigbore Tubewell SSK at Segunsora Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of New Drain from Charar Amtala to Nantu Atha field at Puramouli Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of Concrete drain from Sanirdanga Mukut Bauri house to Sagar Bauri house at Purundhi Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of Pucca Drain form Pradip Roy house to Transformer at Kakradihi Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of Concrete Drain from Mimnul Islam house to Yanush Khan house at Vikurdihi under Andharthole GP, 15 th Fc Fund ( 2025-26)
INSTALLATION OF SOLAR LIGHT 10 NOS NEAR HOUSE OF SISIR DHUA TAPAN KAPRI BAURI DAS DHABAL KALI MELA NIMAI PAL CREMATION SUNIL DHABAL RAGHUNATH DHUA BAGDI PARA. UNDER ANCHURI GP FY-2025-26 Fund-APAS
Construction of Concrete Drain from Aditya Mal house to Basanti Mal house at Chaturdihi Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of Drain Slab from Transformer to Harimela at Dumuria Under Andharthole GP, 15 th Fc Fund ( 2025-26)
BEUTIFICATION OF DURGA MANDIR WITH PAVERS BLOCK AND SITTING BENCH MOUZA-BADULARA JL NO-68 PLOT NO-3259 APAS SCHEME ID- APAS/01/252/214/0002 UNDER ANCHURI GP FY-2025-26 Fund-APAS
Construction of Concrete Drain from Baro Pukur to Bibekinanda Bag house at Shyampur Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Installation of New Rigbore Tubewell near Laltu Roy house at Andharthole Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Installation of New Rigbore Tubewell near Kamarpara Laxmi Mela at Kumidya Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Installation of New Rigbore Tubewell at Bauripara at Kalaboti Under Andharthole GP, 15 th Fc Fund ( 2025-26)
Construction of PCC road from Harimandir towards Roy Para.( Manoharbati)
SOLAR LIGHT AT MUKHUTIPARA LAXMINARAYAN MELA , JL-196, PLOT-252
DESILTING OF POND AT SHIT PARA NEAR JAGADALLA BOTTALA , MOUZA-JAGADALLA, JL NO- 194, PLOT-505
REPAIRING OF ROAD FROM SWARUP SHIT HOUSE TO TOWARDS ASISH SHIT HOUSE, MOUZA-JAGADALLA, JL NO-194, PLOT-566
ROAD REPAIRING OF SUTRADHAR PARA , MOUZA-JAGADALLA, JL NO-194
CONSTRUCTION OF BATHING GHAT AT CHATTARAJ PARA LACHER BUNDH, MOUZA-JAGADALLA, JL NO-194
UPGRADATION OF CULRURAL CENTRE AT JAGADALLA PRIMARY SCHOOL , MOUZA-JAGADALLA, JL NO-194
installation of child friendly corner at karar danga primary school activity id 109178838
installation of deep tubewell with submershable chatal pipeline at hazra para near ful pukur