Loading…
Loading…
13,100 results • Recent activity
Day to Day Operation and Maintenance of Distribution System and Rising Main Pipe Line (DI/CI/UPVC/HDPE) , Ground Tube Well, RBTW with Collecting Line, Stand Post including FHTC of Water Supply Scheme for Ashna (Katjuridanga) and its adjoining
Repair from Ch. 4.00 kmp to Ch. 11.00 kmp of Motgoda-Kadmagarh road under Bishnupur Division, P.W.Dte in the district of Bankura during the F.Y- 2025-26. (2nd call)
Day to Day Operation and Maintenance of Distribution System and Rising Main Pipe Line (DI/CI/UPVC/HDPE) , Ground Tube Well, RBTW with Collecting Line, Stand Post including FHTC of Water Supply Scheme for KENJAKURA and its
Day to Day Operation and Maintenance of Distribution System and Rising Main Pipe Line (DI/CI/UPVC/HDPE) , Ground Tube Well, RBTW with Collecting Line, Stand Post including FHTC of Water Supply Scheme for
Day to Day Operation and Maintenance of Distribution System and Rising Main Pipe Line (DI/CI/UPVC/HDPE) , Ground Tube Well, RBTW with Collecting Line, Stand Post including FHTC of Water Supply Scheme for Ekteswar (Zone- I)
INSTALLATION OF SOLAR STREET LIGHT AT DADKI DANGA 4 NOS SCHEME ID APAS/01/256/53/0002 WITHIN SALDA GP