Loading…
Loading…
7,050 results • Latest
Construction of Girls toilet at Nischintapur Pry School UDISE Code- 19131104303 FY 2026-27 under Hirbandh Dev. Block out of SSM Fund
Construction of Girls toilet at Bansa Pry. School UDISE Code- 19131102101 FY 2026-27 under Hirbandh Dev. Block out of SSM Fund
Construction of Community Hall (shade structure) at Tapta Sangiri Para JL NO 052, Plot No 415 under PS NO 49 of Chiltore GP under Sarenga Block out of APAS 2025-26
Construction of new community hall at Sidi Godanga under P.S. No.56 of Chiltore GP under Sarenga Block out of 2025-26
Electrical Renovation work for B1 quarter, Judges Enclave, Bankura.
Electrical Renovation work for B2 quarter, Judges Enclave, Bankura.
Electrical Renovation work for B3 quarter, Judges Enclave, Bankura.
Electrical Renovation work for A2 quarter, Judges Enclave, Bankura.
Electrical Renovation work for Tista quarter, Judges Enclave, Bankura.
Electrical Installation work related to the implementation of video conferencing system at different places under Bankura Court compound in the district of Bankura under Bankura Electrical sub division-I, PWDte under Bankura Electrical Division, PWDt
Supply, Fixing and replacement of the door motor motherboard, PFR (Phase Failure Relay) and door drive of Lift No. 4 installed at the new Court Building Bishnupur in the District of Bankura.
Electrical Installation work for 1 no staff Quarter at the campus of office of the Deputy Director, ARD and PO, College More, Bankura.
CONSTRUCTION OF DRAIN FROM TENTULDANGA DILIP HANSDA HOUSE TO BIRSHA MUNDA CLUB
WATER TANK REPAIRING NEAR GOCHDA BUS STAND
Repairing work with Water Bound Macadam, Bituminous Potholes, 20 mm Premix Carpet from Ch. 6.00 kmp to 10.00 kmp of Sashpur Dighalgram Road (in stretches) under Bishnupur Division, PWD during the year 2026-2027
GOCHDA STREET LIGHT REPAIRING 12 NOS. ASHOKE GARAI HOUSE TO NEPAL KANRI HOUSE
Construction of CC Drain from Rajar Pole to Korarboni under Punisole G.P within Onda Development Block.
BNK1/01/ 15TH CFC/2025- 2026 DATED 04/06/2026 SL 10
Bishnupur-Kotulpur Road, from Ch. 7.00 kmp to 12.00 kmp and 16.00 kmp to 19.00 kmp (in stretches), emergent restoration work under South Bishnupur Sub Division of Bishnupur Division, PWD in the district of Bankura
SOUPURA ICDS CENTRE REPAIRING (ROOF, WINDOW, TUBEWELL)
DUARIPAL ICDS CENTRE REPAIRING (DOOR AND WINDOW)
GOCHDA SUB-CENTRE WATER PUMP REPAIRING
KUMARDANGA STREET LIGHT AND REPAIRING (10 NOS.) KUMARDANGA MORE TO NAPIT PARA
SOUPURA SOLAR STREET LIGHT 1 NO. SOUPURA NEAR KARTIK KARMAKAR HOUSE
Construction of CC road from Sajahan House to Mojibur House under Punisole G.P within Onda Development Block.
GIS CONSULTANT FOR PREPARATION OF GIS DATA IN IMPLEMENTATION OF GIS BASED RURAL ROAD MANAGEMENT SYSTEM
BNK1/03/ 15TH CFC/2026- 2027 DATED 11/06/2026 SL 08
GOCHDA STREET LIGHT 8 NOS. GOCHDA HARIMANDIR TO GOCHDA PRIMARY SCHOOL
Construction of Irrigation Field Channel-II, at Kolaberia, Mouza- Kolaberia, J.L. No.-313, on Plot No-1511. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
TENTULDANGA STREET LIGHT 4 NOS. DILIP HEMBRAM HOUSE TO BIRSHA MUNDA CLUB
Repair and Renovation of E.I works with Allied work urgently at Dy CMOH-IV Office under CMOH Office, Bankura.
UPDRADATION OF RURAL ROAD BY CC FROM BRAMHAN PARA CLUB TO DAMODAR MANDIR AT NAKAIJURI. JL-279 PLOT- 515 UNDER NAKAIJURI GP,WITHIN ONDA DEVELOPMENT BLOCK.
GOCHDA ICDS KITCHEN SHED AND DOOR REPAIRING
REPAIRING OF FUNERAL HOME AT MOULASOLE (PLOT NO - 1009, JL NO - 323)
Excavation of WHS-I, at Mouza-Maithagopinathpur, J.L. no.-315, on Plot No-445,446. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Construction of Anwanwadi Centres at Chatra AWC (19339240710) NAKAIJURI G.P UNDER ONDA DEVELOPMENT BLOCK. UNDER CHINGANI GP,WITHIN ONDA DEVELOPMENT BLOCK.
CONSTRUCTION OF CULVERT AT MAIN ROAD BORO BUNDH, PLOT - 743, JL - 323
L031 - Masudpur to 09L24 Under Indus Block
Excavation of WHS-I, at Mouza-Bagneja, J.L. no.-287, on Plot No-282. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-II, at Mouza-Bagneja, J.L. no.-287, on Plot No-28. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
INSTALLATION OF SOLAR HIGH MAST LIGHT AT MIT PARA, MOULASOLE
CONSTRUCTION OF GUARD WALL AT BAHARAMURI CULVERT AT MEDINIPUR G.P UNDER ONDA DEVELOPMENT BLOCK.
Excavation of WHS-II, at Mouza-Mukundapur, J.L. no.-306, on Plot No-1039. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
INSTALLATION OF SOLAR HIGH MAST LIGHT AT MOULASOLE RUIDAS PARA, PLOT - 770, JL - 323
REPAIRING WORK OF EXISTING ELECTRIC LIGHT 12 NOS AT MOULASOLE UTTAR BOOTH
L053 - Tungi to SH Under Raipur Block
PAINTING WORK OF ICDS (NO - 92) AT MOULASOLE TARUN SANGHA
Civil, Plumbing and Electrical works for Construction of Model AYUSH OPD Building at SAD Saltora at Saltora BPHC in the district of Bankura , West Bengal under WBMSCL during the year of 2025-26.
REPAIRING CULVERT AT METYALA CONNECTING METYALA TO ARADANGA UNDER CHURAMONIPUR GP,WITHIN ONDA DEVELOPMENT BLOCK.
Repair and renovation of E.I work for VVIP visit at Bishnupur Bungalow, Rest House at the Bishnupur stackyard under Executive Engineer, Bankura Highway Division, P.W.Dte.