Loading…
Loading…
7,023 results • Latest
INSTALLATION OF SUBMERSIBLE WITH WATER TANK AT RADHAKRISHNAPUR ADAK AND MONDAL PARA
UPGRADETION OF ROAD FROM NARU GOPAL HOUSE TOWARDS SUJIT BARUI HOUSE UNDER KULDANGA VILLAGE
UPGRADETION OF ROAD FROM PITCH ROAD TOWARDS SINGHA HOUSE UNDER AMRITPARA
UPGRADATION OF ROAD FROM NEAR THE HOUSE OF GOUR BIR TOWARDS HOUSE OF SUDEB SARKAR
CONSTRUCTION OF CONCRETE ROAD FROM UTTAM MANNA HOUSE TOWARDS UTTAM ROY HOUSE UNDER UTTAR NITYANANDAPUR
CONSTRUCTION OF CONCRETE ROAD FROM AKHIL BASU HOUSE TOWARDS KANAI BISWAS HOUSE
CONSTRUCTION OF CONCRETE ROAD FROM RIPAN SARKAR HOUSE TOWARDS BASUDEB BISWAS HOUSE NEAR BAT TOLA PLOT-403 UNDER BELOA
CONS OF CONCRETE ROAD FROM BADAL GHOSH HOUSE TOWARDS NATUN PUKUR DAKSHIN PARA AT BONDALHATI
CONSTRUCTION OF CONCRETE ROAD FROM PANCHKULA BISTU BAURI HOUSE TOWARDS ICDS CENTRE
CONSTRUCTION OF CONCRETE DRAIN FROM JAGABANDHU PAL HOUSE TOWARDS RAJU BAGDI HOUSEUNDER JAGAMOHANPUR VILLAGE
CONSTRUCTION OF DRAIN FROM ASHOKE DHARA HOUSE TOWARDS DILIP MONDAL HOUSE UNDER FAKIRDANGA
CONS OF CONCRETE COVER DRAIN FROM SUNIL MNDAL HOUSE TOWARDS BACK SIDE OF GOPAL SHIT HOUSE
CONSTRUCTION OF CULVERT AT DEBNATH PARA PLOT-3/43 JL-107 UNDER NITYANANDAPUR MOUZA
CONSTRUCTION OF COVER DRAIN FROM BRAMBHEEN PARA DURGA MANDIR TOWARDS DEBDAS GHOSH HOUSE
CONSTRUCTION OF CONCRETE DRAIN FROM BAREN DIYASHI KHAMAR TOWARDS SALI RIVER AT RAUTARA VILLAGE
UPGRADETION OF ROAD FROM MAYAPADA BAGDI HOUSE TOWARDS IN SIDE OF BAGDI PARA GOPAL GHOSH HOUSEVILLAGE
UPGRADETION OF ROAD FROM SAMIRS LEDH TOWARDS BUDDHADEB JANA HOUSE UNDER PURBAPATHARHATI VILLAGE
UPGRADETION OF ROAD FROM BADRINATH HOUSE TOWARDS KANAI BARUI HOUSE UNDER KULDANGA VILLAGE
UPGRADETION OF ROAD FROM ISABPUR MAIN ROAD TOWADRS SWAPAN ANKURE HOUSE UNDER ISABPUR VILLAGE
Estimate for Installation of 10 nos of Solar Light at Anandabazarunder Jhunjka GP under Chhatna Development Block under APAS Programme (Scheme ID -APAS/01/248/51/0005
ESTIMATE FOR INSTALLATION OF 05 NOS SOLAR LIGHT NEAR EATHANI HARIMANDIR AND OTHERS 04 UNDER JHUNJHKA GP under Jhunjka GP under Chhatna Development Block under APAS Programme (Scheme ID - APAS/01/248/39/0004
Estimate for Installation Stand Alone Solar PV Street Lighting System (18 Watt LED Light) 6 NOS SOLAR LIGHT AT MAJHIDI VILLAGE under Jhunjka GP under Chhatna Development Block Under APAS Programme ( Scheme ID - APAS/01/248/47/0001 )
CONSTRUCTI ON OF CEMENT CONCRETE ROAD FROM MORA GERE TO KAMARE AT KALLAIYA (109377550) (Amlasole)
Estimate for Installation Stand Alone Solar PV Street Lighting System (18 Watt LED Light) 6 NOS STREET SOLAR LIGHT AT MAJHIDI and KULBEDYA VILLAGE under Jhunjka GP under Chhatna Development Block Under APAS Programme ( Scheme ID - APAS/01/248/47/
CONSTRUCTI ON OF CEMENT CONCRETE ROAD FROM JALADHAR KOLEY HOUSE TO MADHUSUDAN KOLEY HOUSE (109351214) (Dakshinbar)
Repair and renovation work including replacement of damaged asbsestos roof sheet of Lecture theatre - 1 and Lecture theatre - 2 at ground floor of Administrative building at Lokepur campus of Bankura Sammilani Medical College under Bankura Division,
CONSTRUCTI ON OF CEMENT CONCRETE ROAD FROM AADHKATA TO KABIRAJ DANGA (109350615)(Dakshinbar)
COSNTRUCTI ON OF CEMENT CONCRETE ROAD FROM NIDHURAM GHOSH HOUSE TO CHANDI MIDDYA HOUSE (109379601 ) (ROHILAKONE)
Annual Maintenance estimate of the E.I. work at MCH Building of Bankura Sammilani Medical College and Hospital. -------Renovation and rectification of E.I. work at various location of MCH and OPD building under BSMC and H, Bankura.
Annual Maintenance of the E.I work at B.C. Roy Boys Hostel, Ladies Hostel New, Ladies Hostel Old , Chamerri Hostel, Rabin Hall Hostel, Lokepur Cottage Building Total 7 Nos residential type students hostel of Bankura Sammalani Medical College and Hos
Repair, Renovation and Modification of the Students Practical room and Different Service Laboratories of Microbiology Department at Natun Bhawan ground floor, under BSMC and H , Bankura, Electrical Installation Works.
Annual Maintenance estimate of the E.I. work at MCH Building at Bankura Sammilani Medical College and Hospital Campus under BSMC and H, Bankura.------ Renovation and rectification of E.I work at various location of hospital campus under BSMCH
Annual Maintenance estimate of the E.I. work at MCH Building of Bankura Sammilani Medical College and Hospital ...Repair and rectification of EI work at PNW-2, DEIC, Pediatric ward and Ground floor of MCH building under BSMCH, Bankura.
Emergent repair (non Bituminous) of Simlapal Benagoria Road via Raipur (SH-9) from 3.80 Km to 36.30 (in stretches) Km under Bishnupur Division, PWDte. in the District of Bankura during the year 2026-2027.
Annual Maintenance of the E.I work at B.C. Roy Boys Hostel, Ladies Hostel New, Ladies Hostel Old , Chamerri Hostel, Rabin Hall Hostel, Lokepur Cottage Building Total 7 Nos residential type students hostel of Bankura Sammalani Medical College and Ho
REPAIR CC ROAD AT LADDA VILLAGE FROM TAPAN MAHATA HOUSE TO RAMJIBON MAHATA HOUSE 200FT, P.S. NO - 191 - Ladda Prathamik Vidyalaya.
Annual Maintenance of The E.I work at Main Building , Natun Bhavan, Morgue, Phycriatic Building of Bankura Sammalani Medical College an Hospital under BSMC and H Electrical Section-II, PWDte . For the period of the year of 2024-2025------Supply , In
Annual Maintenance Estimate of the E.I Work at Main Building, Natun Bhawan , Morgue, Psychiatric Building of Bankura Sammilani Medical College and Hospital under BSMC and H Electrical Section -II , P.W.Dte. For the Period of the year of 2024-25 -----
Supply , delivery and fiting fixing of 400 amp and 300amp Power Contactor with other works at Intake (Raw water) pumping station near Durgapur Barrage under Barjora , Bankura I and II Block water supply scheme under Bankura Mechanical Division
Construction of Big Dia Rig Bored Tube well and installation of Pumping machinery at Bishnupur District Hospital under Bankura Mechanical Division P.H.E Dte
Supply delivery and Installation of 2 nos Valve for IBS Uporgora of Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Saltora, Dist- Bankura.
Operation and Guarding of Pumping machineries and other Electro mechanical installation at Saburbandh Water Supply Scheme under Bankura Mechanical Division, PHE Dte
Re-filling of liquid chlorine gas for 100 kg each capacity cylinder with allied works for different OHR sites and w/s schemes under Saltora and other Blocks in the Dist Bankura under Bankura Mechanical Division, PHE Dte.
Supply delivery and Installation of 2 nos Valve for Intake Kukrakuri of Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Saltora, Dist- Bankura.
Re-filling of liquid chlorine gas for 100/50 kg each capacity cylinder with allied works for different OHR sites and w/s scheme under Khatra, Hirbandh, Ranibandh, Sarenga, Raipur, Simlapal and other Blocks in the Dist Bankura
Supply, Delivery and installation of Power Correction device and allied works at Saburbandh water supply scheme under , BMD, PHE Dte. Block Saltora Dist Bankura.
UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
UPGRADATION OF ROAD FROM ANKURE PARA ICDS CENTRE TOWARDS KARTICK ANKURE HOUSE UNDER UTTARDERIAPUR
UPGRADATION OF ROAD FROM MAHIDUL MONDAL HOUSE TOWARDS BAMNAR PUKUR VIA ALAUDDIN HOUSE UNDER UTTARDERIAPUR
CONSTRUCTION OF CONCRETE ROAD FROM MRINAL DAS HOUSE TOWARDS SUBODH DAS HOUSE UNDER UTTAR NITYANANDAPUR