Loading…
Loading…
118 results • Latest
Quick Lime For Chemical Industries (V2) Conforming to IS 1540 Part 1 (Q3) (3 (3 ))
Ward mutharref Abadi Thana Chauraha se CHC mod PWD puliya tak interlocking footpath Nirman karya
WORK MUTARRIF ABADI MEN THANA CAURAHA SAMUDAYIK TOIET SE PWD PULIYA TAK INTERLOKING PUTHPATH NIRMAN KARYA
MOHALLA PYARANPUR ME SHARIFABAD PULIYA SE PRATHMIK VIDHYALAYA KE SAMNE TAK CC ROAD AND NALI NIRMAN KARYA
Construction of a concrete road and covered drain from Jagdish Maurya house in Lalapur, passing through the houses of Shri Chandra and Hanuman Maurya, to Chhote Yadav house
Construction of a CC road and covered drain in Lalapur, extending from Islam house, passing by the houses of Amir Hasan and Mustaqim, up to Maqbool house
Construction of a concrete road and covered drain on Fatehpur Road in Hujjaji West-2, from Wasim house, passing through the houses of Kallu, Annu, and Rasheed, to the houses of Rauf and Nizamuddin
Construction of a covered drain on Eidgah Road in Ward Nalapar South stretching from Chhanga Paan Shop to Nisha Health Clinic.
Construction of an RCC box culvert and approach over the unpaved drain for Ward No 7 Nalapar South 05 Green City Colony.
Construction of an interlocking road and an RCC covered drain in Ward No 6 Pachghara 02 extending from Manoj house passing by Shivkumar house Ramesh house and Ambedkar Park to the stretch between Somnath house and Chandrika house.