Loading…
Loading…
1,407 results • Latest
NIT07 LOT05
Construction of a Antyeshti Sthal on Plot No. 49 in Ward Nalapar Uttari Mohalla Kheriya.
Construction of a covered drain in Ward Brahmnitola 01 Indiranagar extending from Ghulam Rasul house to Nasim house and from the mosque to Rahmat Ali house.
Construction of a covered drain in Ward Nalapar Uttari Mirdhanpurwa along Bhagauli Road stretching from Rukmesh house past Balaji Medical Store upto the water tank cross culvert
Construction of a CC road and covered drain in Ward Nalapar Uttari along Bhagouli Road starting from opposite Aryan Hotel passing by Md Ishaq house and extending up to Sagir house
Construction of a retaining wall and interlocking footpath for the damaged road at the western pond in Ward Katghara Lahasi Khapurwa.
Construction of a covered drain in Ward Dashrathpur Guthvanpurwa extending from Mukesh house passing by Dilip house and reaching Kharja
Construction of a covered drain and CC road in Ward Dashrathpur Guthvanpurwa extending from Mukesh house passing by the houses of Harilal and Lakhan upto the mosque
Construction of a CC road and covered drain in Ward Nalapar Uttari Kheriya extending from Vijendra Kumar house to the pond via the houses of Rammilan Rajesh and Taj Mohammad
Boulder pitching work for river bank protection work and making of stair slope and all required work including all cost of material, labour, tool and plant etc. at Kasimpur North pump canal in district Barabanki.
LED Luminaire For Road And Street Lights Conforming To IS
Trailer Mounted Suction Machine (Q3)
Construction of interlocking footpath and covered drain in Ward Nalapar South 05 along the left side of the Fatehpur Dewa Road stretching from the Railway Station turn past the public toilet upto the culvert.
Construction of interlocking footpath and covered drain in Ward Brahmani Tola along the right side of the Fatehpur Deva Road stretching from the bus station past Azad Inter College up to the culvert.
Surveying, Soil investigation, design and Supply of all materials, labour T P etc. complete required for completion of works of Ramsanehi GhatNagar Panchayat Water Supply Scheme on turn- key basis.
Surveying, Soil investigation, design and Supply of all materials, labour, T P etc. complete required for completion works of Dariyabad Nagar Panchayat Water Supply Scheme on turn- key basis.
Supply of 420 KV 1250A RIP or RIS Bushing with Metal Parts
BHATKHERA WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
SABJIMANDI WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
BRAMNAN WARD ME VIBHIN ISTHANO PER RCC NALI CROCING AND RCC SLAB INTERLOCKING WORK IN NAGAR PANCHAYAT HAIDERGADH
PURE MITAI WARD ME VIBHIN ISTHANO PER RCC NALI CROCING AND RCC SLAB INTERLOCKING WORK IN NAGAR PANCHAYAT HAIDERGADH
Development of New A site RO with facilities like Sales Building, Canopy, Paver block driveway and other allied civil n electrical works at location Between KM Stone 86 to 100 on NH-927, Barabanki Bahraich- Rupaidiah road, Distt-Bahraich Lucknow DO
LED Luminaire For Road And Street Lights Conforming To IS
Repair of UPSWC Godowns at Haidergarh (Barabanki)
THATRAHI WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
QURASHI WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
SUBHAS WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
GAUSIYANA WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
KHOTHI WARD ME VIBHAN ISTHANO PER RCC NALI CROSSING AND RCC SLAB INTERLOCKING in NAGAR PANCHAYAT HAIDERGADH.
LOHIYA WARD ME VIBHIN ISTHANO PER RCC NALI CROCING AND RCC SLAB INTERLOCKING WORK IN NAGAR PANCHAYAT HAIDERGADH
LILHORA WARD ME VIBHIN ISTHANO PER RCC NALI CROCING AND RCC SLAB INTERLOCKING WORK IN NAGAR PANCHAYAT HAIDERGADH
Construction and beautification of a park in Daramnagar, under Ward Badel.
Construction of an RCC covered drain from behind Amit Singh house in Nehru Nagar Ward to the Jamuria Nala.
THAKURDWARA WARD ME VIBHIN ISTHANO PER RCC NALI CROCING AND RCC SLAB INTERLOCKING WORK IN NAGAR PANCHAYAT HAIDERGADH
Behind the Ear Hearing Aid (Digital) (Q2) (3 (3 ))
Truck Mounted Boom Lift Platform (Q2)
Tricycle, Hand Propelled for Specially Abled Conforming to IS 8088 . (Q3), Foldable Wheelchair (Adult) (Q2), Adjustable Axillary Crutches (Q3), Walking Stick (Adjustable Height) (Q3) (3 (3 ))
Braille Kits, Kit for Special School Students (Intellectual Disability) - Kit 3 Age Group 7 to 11 Years, ADL Kit for Leprosy Affected People, Smart Cane
Patch repair of Village roads in Haidergarh Block Group II
FRP Urinal Cabin (V2) (Q3)
FRP Urinal Cabin (V2) (Q3)
SR To Safderganj Badosarai Road to Amradevi Link Road
11/SE/EWC/AYO/2026-27
Tricycle or Rickshaw for Carrying Goods (V2) (Q3) (3 (3 ))
SILT CLEARANCE OF AHMADPUR MR. FROM KM 0.000 TO 5.000
SILT CLEARANCE OF NIHALPUR MR. FROM KM 0.000 TO 5.000
SILT CLEARANCE OF KASHIPUR MR. FROM KM 0.000 TO 5.500
SILT CLEARANCE OF PALHARI MR. FROM KM 0.000 TO 5.200
SILT CLEARANCE OF MURLIGANJ MR. FROM KM 0.000 TO 3.200
SILT CLEARANCE OF MURTJIPUR MR. FROM KM 0.000 TO 3.400