Loading…
Loading…
2,063 results • Recent activity
All in One PC (V2) (Q2) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 1 Lakh (s)
SPARES FOR TOURSIM SNOW GROOMERS PB300W
FRT LOWER ARM BUSH, ROD SPRING BUSH, SYNCHRONISER RING, MAIN RELAY, SPEEDOMETER SENSOR, HOSE ASSY PIPE
Custom Bid for Services - Hiring of Tipper for 24 months for Uri Power Station Similar Category Goods Transportation service - Monthly Based Service Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis)
Whole Wheat Flour (Atta) (V2) (Defence) (Q2), Suji for Defence (Q3), Refined Wheat Flour (Maida) (V2) (Defence) (Q2), Dalia for Defence (Q3), Bran for Defence (Q3), Whole Wheat Flour (Atta) for Extreme Cold Climate and High Altitude Areas (Defence) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6897857 Dated : 17-12-2025 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Whole Wheat Flour (Atta) (V2) (Defence) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 988400 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/12 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Army Cdr HQ Northern Command (ST), Pin-908545, C/o 56 APO (Goc-in-c)
Log Book Printing, NVR for PTZ Camera, HDMI Cable 3mm, Adopter Media Convertor, Bty 9V, Register 300 pages, Steel Plate for frame, Memory Card 64GB, Trolly for veh reapir, Media Convertor, Treadmil Oil, Wire 2 point 5mm, Cutter Blade 4 inch, Pencil Cell, Distil Water, Wooden Board 48 by 36 inch, Steel Plate A3, Steel Plate 6 by 4 inch, Laser Printing 48 by 36 inch, Switch 15 Amp, Motor for Speedybee 3 point 5 inch, Balance Charge Wire, Propeller Balance ch wire 7 inch, LED Light 15 W, Swithch Combined, Top 15 Amp, Top 5 Amp