Loading…
Loading…
255 live130 closing this weekmost from CE Public Works Department and PWD - CE AND AS
255 results • Latest
अन्ता सीसवाली सड़क से सोनवा किमी. 0/0 से 4/350 तक सड़क नवीनीकरण कार्य राशि रू. 101.88 लाख
AMC for Statcon make Battery Chargers installed for DC system of Unit-I to IV, 400KV Switchyard Phase-I&ampII, PLCC of Phase-I&ampII and Silo area Phase-I, CTPP.
Third Party safety audit at CTPP Chhabra Thermal Power Plant
Repairing of BHEL make BAPCON Plus, ARECA and RAPCON controllers and controller cards of ESP Unit-1 to 4 of CTPP, Chhabra.
Work of Hydrogen gas cylinders testing, painting and Providing and installation of new valves if required any as per IS 3224 for 4x250 MW Generators of Unit-1 to 4 CTPP, Chhabra as per Gas Cylinder Rules 1981 under Indian Explosive Act 1884 and 2004.
SPORTS EQUIPMENTS
Annual contract for routine, breakdown, capital maintenance and assistance in operation work of Screw Type Compressors and Compressed Air System of Main Plant, Unit 5 and 6 (2x660MW),CSCTPP, RVUNL, Chhabra.
Annual work contract for routine, breakdown, capital maintenance and assistance in operation of Water Pre treatment plant, Raw water system, RW chlorination system and Chemical house of Unit 5 and 6 at CSCTPP, Chhabra.
Annual contract for Routine, Breakdown and Capital Maintenance work of Effluent Treatment Plant, Sewage Treatment plant, all connected supply pits and Operation work of STP Plant of Unit#1 to 4, 4x250 MW Chhabra Thermal Power Project, Stage-I, Chhabr
Annual contract for Regular Sweeping and Cleaning of Roads, Berms and dustbins at CTPP Colony, Chhabra
Annual work contract for replacement of hot end sector plates in APH with new one at 2x660MW Unit 5 and 6 at CSCTPP Chhabra
Supply of boiler Tube Protection Shielding for Economiser zone in boiler of 2x660 MW, CSCTPP,Chhabra
Supply of RAPH Spares for RAPH model no. 33.5 VAT 1530 at 2X660 MW, CS-CTPP, Chhabra
Annual work contract for online leakages attending without any shut down of the units by online sealing technique in Turbine and Boiler area of unit5and6 of 2x660 MW, CSCTPP, RVUNL, Chhabra
Supply of spares for the Mill Reject Handling System installed at 2X660 MW CSCTPP, Chhabra
Supply of Non-metallic expansion bellows for Primary, Secondary and Flue gas duct bellows of Boiler of 2X660 MW Units of CS-CTPP,RVUNL,Chhabra
Grinding and Polishing of Existing Kota Stone Flooring at 17.0 Mtr. TG Floor in Front of Main Control Room, CSCTPP, Chhabra
Supply of coal burner body for Units 5 and 6 (2x660 MW), CSCTPP, Chhabra
Annual R and M of drains at CSCTPP, Chhabra
Misc. civil works for development of existing two wheeler parking at CSCTPP Plant Gate including covering by provision of shed
Annual contract for day to day cleaning and sweeping work of common areas, premises including door to door garbage collection and its disposal work for Multi Storey Township of CSCTPP, Chhabra
Supply of power and control fuses of CSCTPP U5 and U6 for the year 2026-27
Supply of Butterfly valve installed in fire fighting system at CSCTPP, RVUNL, Chhabra
Supply of belt watch sensors and switches installed in CHP, CSCTPP, Chhabra
Requirement of hoses installed at various locations at CHP-CTPP, Chhabra
Requirement of Rubber pads for clamps of Wagon tipplers of phase-I at CHP-CTPP, Chhabra
Const of 2 row VCW in km 1/700 Kund to Chainpuriya
Const of 2 row VCW in km 1/050 Kund to Chainpuriya
Const of 2 row VCW in km 0/080 A/R to Laxmipura
Construction of CD work at Khopar Kohani Road CH 0/900
Construction of CD work at Chhabara to Patna via Kadiyanohar–Mundkya CH 5/600
Construction of CD work at Faizpur to Peepalkheri–Kullipatta CH 6/00
Construction of CD work at Khoni to Ghaghonia CH 2/300
Construction of CD work at Khoni to Ghaghonia CH 2/500
Construction of CD work at Banjari to Motipura CH 0/720
Construction of CD work at Umariya to Amritkheri CH 0/750
Const of 1 Row HPC box ulveret &amp drain work on SH 51 Karkarkheda to Charnkheri via Viyas kheri Km 0/200 and 1/500
Const of vented causeway and Protection wall on Amli to Badora road km 5/475,7/400,8/800 and 9/250
Const of 2 row HPC culveret &amp drain work on Kawai Musaigujran via Hanuwatkhera road Km 0/100
Const of 1 Row HPC culvert and Drain work on Anta Sangod Dhoulakhawan Km 19/0
Const of 2 Row HPC culvert and CC work on A/R to Gordi Km 5/0
Annual work contract for routine, breakdown, capital maintenance and assistance in operation of Water Pre treatment plant, Raw water system, RW chlorination system and Chemical house of Unit 5 and 6 at CSCTPP, Chhabra against TN-SC-W-46 /2026-27(CA).
Annual work contract for replacement of hot end sector plates in APH with new one at 2x660MW Unit 5 and 6 at CSCTPP Chhabra
Annual contract for routine, breakdown, capital maintenance and assistance in operation work of Screw Type Compressors &amp Compressed Air System (Control Air System, Service Air System and Mill Reject Handling System compressors) of Main Plant,
Supply of Butterfly valve installed in fire fighting system at CSCTPP, RVUNL, Chhabra
Annual work contract for online leakages attending without any shut down of the units by online sealing technique in Turbine and Boiler area of unit5and6 of (2x660 MW), CSCTPP, RVUNL, Chhabra