Loading…
Loading…
745 results • Latest
Auctioning of Scrap (Recyclable) material generated from Garbage Collection at Garbage to Gold Centre on regular basis for one year
Cell Tower on Wheel
CONSTRUCTION OF TOILET BLOCK AT GOVERNMENT HIGH SCHOOL KYARA DISTRICT.- BAREILLY (U.P.)
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
CONSTRUCTION OF LIBRARY ROOM AT GOVERNMENT HIGH SCHOOL AURANGABAD DISTRICT.- BAREILLY (U.P.)
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
Lott-3 (2 Nos.) CONSTRUCTION OF DRINKING WATER FACILITY AT RAJKIYA HIGH SCHOOL NARA FARIDPUR AND RAJKIYA GIRLS INTER COLLEGE TURSAPATTI DISTT.- BAREILLY (U.P.)
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
CONSTRUCTION OF C.M. MODEL COMPOSITE SCHOOL AT RAJPUR KHURD, TEHSIL-AONLA, DISTRICT-BAREILLY (U.P.)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kind of Soil
HANDLING WORK FOR WHEAT PUR 26-27 BUDAUN B-PAX BUTLA
PRICE BID (Sample BOQ Template )