Loading…
Loading…
676 results • Latest
Construction of a drain and CC road from Sushil Kumar to Karan Swaroop via Rajveers house in Ward 29.
Construction of a CC road and RCC drain in Ward-04, extending from along the Chopula Overbridge up to Prithviraj.
Drainage and CC-tiled road works in Ward-44, Kasgaran specifically from the Gandhi Statue (near the Banana Tree) up to the Malookpur Hanuman Temple, as well as in the connecting lanes, and within Malookpur, in the Prabhat Wali Gali and Sharab Bhatti
Construction of a drainage system and CC road in Ward-09, from the SP Office Gate to Dr. Amit Davis residence.
Ward-16, Central State Colony Construction of the boundary wall and pathways for the park located within the colony painting and whitewashing works and installation of an open gym, benches, dustbins, swings, and horticultural landscaping.
Construction work for drains and CC roads in Ward-49, Shastri Nagar specifically in the lane adjacent to Kanchan Neer (extending from Apurva Gangwars house, past Imrans house, up to Shamim Ahmeds house), as well as in Gali Wasim, at G-Fitness Gym, an