Loading…
Loading…
215 results • Latest
MMUPPNA_RIDF_XXXI_25_26_02 Improvement and Widening of Barpeta Bhawanipur Road from (Ch-0.00km to 4.400.00km) under Mukhya Mantrir Unnoto Paki Path Nirman Achani (MMUPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
Construction of Sub Centres with Prefabricated steel structure, brick work in foundation, 112 mm thick brick walling at various places of Assam Pkg. No. G (Balance work of 5 nos. of SC in Barpeta District) under NHM on Turn Key Basis.
Restoration of DRDA Bund of river Tihu including AE measures to protect village Medhittari No. 5 Block, Kawaimari No.6 Block and Kawaimari No.7 Block on its R/B, Package 1.
MMPPNA_RIDF_XXXI_25_26_526 Construction of road from (1) Pislapara Thansali mandir to Pranjit Das house via Banua gokhai mandir (2) Gellapara mosjid to Nuro Ali house via Lt Narohari Das house under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) und
MMPPNA_RIDF_XXXI_25_26_474 Improvement of Road starting from PMGSY road at Bhaluki to Salmara west side under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
Monthly Basis Cab & Taxi Hiring Services - Sedan; 1200 km x 208 hours; Local
BTR_RIDF_XXXI_25_26_04 Construction of road from (i) Merkuchi devachara road to Polokata road via Nehru Anchalik high school (ii) PMGSY road (Lamdangpara) to bennabari link road under RIDF-XXXI of NABARD for the year 2025-26.
Recovery and Re-Construction of Road from Gaurangghat to Gutipara Pt-IV Road (PMGSY Package No. AS-05-41 ) under NDRF (PDNA-2022) for the year 2025-26
FRFC CABNINET 10 QUANTITY
Construction of RCC Retaining Wall and Brick Boundary wall on West and North side of Proposed Sewage Treatment Plant
Drainage Work inside and outside of Waste management campus at Barpeta under the Tied Grant 2023-24 1st Instl during the year 2024-25
Restoration of DRDA Bund of river Tihu including AE measures to protect village Medhittari No. 5 Block, Kawaimari No.6 Block and Kawaimari No.7 Block on its R/B, Package 2.
Textile Boots with Polymeric Sole (Jungle Boots) Conforming to IS 17861 (Q3) ( ( 3 3 ))
Restoration of DRDA Bund of river Tihu to protect village Batiya, Khairartari and Kawaimari No.G Block on its L/B.
Protection at Pachim Barbala, Bhulkabari pather and khandarkur area from the erosion of river Palla on its L/B.